View recent requests to
Install Electrical for a Home Addition or Remodel in Bismarck, ND
Project Location: Bismarck ND
Date: 02/2012
What kind of location is this?: Home/Residence
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Project description: Complete wiring for addition or remodel
Comment: Two apartments running on the same breaker, wires may need replacement, power fails frequently, cannot have microwave and heater plugged in at same time. Too many amps on one breaker, I suspect.
Project Location: Bismarck ND
Date: 02/2012
Electrical Devices: Switches (standard)
Electrical Devices: Wall outlets
Rooms Included: Garage or Basement
Historical Work: No
Covered by Insurance: No
Desired Completion Date: More than 2 weeks
Request Stage: Ready to Hire
Project description: Complete wiring for addition or remodel
Property Owner: Yes
Comment: Basement addition. The framing has already been done so the walls and ceilings are opem.
Project Location: Bismarck ND
Date: 03/2011
Electrical Devices: Attic/Whole house fans
Electrical Devices: Ceiling fixtures/fans
Electrical Devices: Dedicated circuits
Electrical Devices: Doorbell
Electrical Devices: Floor outlets
Electrical Devices: Lightning protection
Electrical Devices: Specialty lighting
Electrical Devices: Surge protection
Electrical Devices: Switches (standard)
Electrical Devices: Telephone/modem line
Comment: Remodel project. I need a electrician.
Project Location: Bismarck ND
Date: 02/2011
What kind of location is this?: Home/Residence
Historical Work: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Project description: Complete wiring for addition or remodel
Property Owner: Yes
Comment: A kitchen, one bathroom, one living room, a small hallway, a utility room
Project Location: Bismarck ND
Date: 03/2010
Consumer Owns Home: Yes
Electrical Devices: Switches (standard)
Electrical Devices: Telephone/modem line
Electrical Devices: Wall outlets
Rooms Included: Bathroom(s)
Rooms Included: Bedroom(s)
Rooms Included: Garage or Basement
Rooms Included: Laundry or utility room
Rooms Included: Living, Family, or Dining rooms
Historical Work: No
Comment: Multi-level home (4 levels). Top two levels are complete, bottom two are framed only. This is the site of the work needed. Approximately 1200 sq. ft. <br /> <br />There will be 2 bedrooms, 1 living room, 1 bathroom/laundry, 1 storage, 1 mechanical room. <br /> <br />We would like to plan to have work completed around March 29th provided we find a quality installer.
COMMUNITY
Know any great Electricians in the Bismarck area? Let us know about them and you might be eligible to receive a Amazon.com gift certificate. Refer A Pro today!
License Requirements for Electrical in Bismarck, ND: