View recent requests to Analyze a Soil Issue (Soil Testing) in Dallas, TX
Project Location: Dallas TX
Date: 10/2011
What kind of location is this?: Home/Residence
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Comment: I need an estimate for some preliminary designs for a residential project.
Project Location: Dallas TX
Date: 10/2011
Need for Soil Engineer: Construction recommendations
Need for Soil Engineer: To apply for building permit
Type of Project: New Construction
What kind of location is this?: Home/Residence
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Comment: I just need a soil boring and then subsequent data of soil makeup on building lot for the engineer to make foundation accordingly.
Project Location: Dallas TX
Date: 09/2011
Need for Soil Engineer: Other
Need for Soil Engineer: Repair/mitigation recommendations
Type of Project: Retaining wall
What kind of location is this?: Home/Residence
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Comment: analysis stress on retaining wall from adjoining properties. retaining wall is approximately 5 feet on our property and have 4 property owners that adjoin our property.
Project Location: Dallas TX
Date: 09/2011
Need for Soil Engineer: Construction recommendations
Type of Project: Foundation, slab-on-grade or piling
What kind of location is this?: Home/Residence
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Just purchased existing home in Preston Trails. Home built in 1973 with both piers and slab. Doing demolition of home. Not sure if piers are necessary for future home. What should we ask the demolition company to do with existing piers; remove completely, cut at grade level or cut 2 ft (or more) below grade level. <br />
Project Location: Dallas TX
Date: 06/2011
Need for Soil Engineer: Check specific soil conditions
Need for Soil Engineer: Construction recommendations
Type of Project: New Construction
What kind of location is this?: Home/Residence
Desired Completion Date: Within 1 week
Request Stage: Planning & Budgeting
Comment: building new home on hill.Need to make sure builders slab/foundation is correct for conditions before concrete poured.ASAP
COMMUNITY
Know any great Soil Engineers in the Dallas area? Let us know about them and you might be eligible to receive a Amazon.com gift certificate. Refer A Pro today!
License Requirements for Architects & Engineers in Dallas, TX: