Design Preparation: Have a basic idea of what I want
Areas to be Landscaped: Back yard
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Install sod on 300 to 350 sq ft area in backyard. Surounded by rock on almost all sides. Soil needs minimal redistribution/leveling, addition of 3-way soil mix, then sod. Edging bricks required.