Type of Gas Barbeque: Inserted gas grill unit in masonry structure
Barbeque Pit Material: Concrete
Base of Barbeque: Masonry patio
What kind of location is this?: Home/Residence
Materials Provided by Homeowner: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Property Owner: Yes
Comment: need to tap natural gas feed at fireplace (in basement), run about 12' of gas line inside house, penatrate to outside, run about 20' of gas line outside above grade along block wall. make connection to gas line for fire pit (already installed) and connection to grill. will need a 2-way shutoff valve.
Type of Gas Barbeque: Portable gas grill (skip questions #2-4)
What kind of location is this?: Home/Residence
Materials Provided by Homeowner: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Natural gas pipe already going to outdoor deck. I have a natural gas grill assembled but need assistance in ensuring it is connected appropriately. (Also have 2 other plumbing jobs as well.)