Nature of the repair: Faulty or broken stairs/railing
Nature of the repair: Loose decking or stairs
Nature of the repair: Re-staining
Nature of the repair: Stairs/Railings not to code
Current deck material: Pressure-treated pine
Is this an emergency?: No
Covered by Insurance: No
Desired Completion Date: Within 1 week
Request Stage: Ready to Hire
Property Owner: Yes
Comment: Strip and re-stain deck. Seal with a polyurethane topcoat. Install railing and stairs. screw in loose boards or replace if necessary. This completes the project request