Plumbing fixtures: Yes - I plan to install new plumbing fixtures
Tile: Yes - I plan to install new tile
Historical Work: No
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Part of larger remodel: No
Property Owner: Yes
Comment: need to have tub replaced, plumbing replaced (broken drain mechanism), shower head (preferably continue to use a hand held), and change from hot and cold faucet (if necessary) to the one piece type. need new tub surround or tile, new toilet, and new tile floor.
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Interested in Green Alternatives: Yes
Are you updating a shower or a bathtub?: Bathtub
Desired Completion Date: Less than 2 months
Comment: removing a claw leg standalong tub and shower configuration (newly installed - but not practical) for a 6 ft tub and shower with frameless glass. The plumbing is currely external and needs to be put into wall. So it will be tub, tile for wall, plumbing moved into wall, tub and shower fixtures, and a small linen closet intalled next to tub.