Comment: house to be built in a ve18 and possible ve30 zone. need to be familiar with the requirements of building a coastal home. Have a floor plan sketch of a one story full time residence and an artist rendering of the outside. will need stamped drawings and a contractors list of materials for submission to town hall and the ability to work with us in the future to make changes to the file. and to submit a file to the builder.
Comment: Architectural drawings including exterior elevations, floor plans, foundation plan, framing plans, sections and roof plan.No schematic design drawings or site orientation review are requested. Sketches and pictures to be provided will present a clear and complete idea of our design selection. Need documents in 4 to 6 weeks.