Additional Needs: Site preparation (excavation, grading)
Wall Length: Less than 10 ft
Wall Height: 5 - 6 ft
What kind of location is this?: Home/Residence
Desired Completion Date: 1 - 2 weeks
Request Stage: Planning & Budgeting
Property Owner: Yes
Comment: We have a wall down by the lake that is usually partly submerged in water. Half of it has fallen down and the water level is now low enough that we can have it repaired or rebuilt at this time before it is too cold.