Framing Needs: Entire house as part of new home construction
What kind of location is this?: Home/Residence
Desired Completion Date: More than 2 weeks
Request Stage: Ready to Hire
Comment: Rebuilding on existing lot in footprint of previous building. Replacing single story with a two story on half the footprint. Hurricane& Flooding code strictly including in purchase materials and construction.
Comment: I need a quote on a framing job on a house. Preexisting home, gutted, single story on slab. I have a framing plan. Wants to meet with someone and do a walk through