Have you already purchased the materials for this project?: No
Desired Completion Date: Timing is flexible
Request Stage: Ready to Hire
Comment: installation of hardwood flooring in entire house (including stairs) and excluding bathrooms. Approximately 2300 sq ft. Carpet is pulled and all the pre-work will be done
Have you already purchased the materials for this project?: No
Historical Work: No
Covered by Insurance: No
Comment: Remove and replace ~980 sq ft floor in an open loft. Floor is a floating design over sleepers on concrete. Floor material to be installed is #2 red oak requiring sand & two finish coats. All underlayment materials (sleepers, insulators, etc.) to be replaced. Also, install new 4" baseboard (~150 linear ft).