About This Gallery
Approximately 850 S.F. unfinished basement. Plumbing systems and HVAC system were reworked into soffits to allow for an 8 ft ceiling height. Ceramic floor tile was installed in entry area, bathroom, and Kitchen/ wet bar area. Bathroom included vanity, toilet, shower, and built-in linen shelves. Extensive recessed lighting on individual dimmer controls was installed to allow multiple lighting setups. Project was completed in under 6 weeks.