About This Gallery
A Job that included cutting and attaching mouldings, and trim. Painting of all walls, ceilings, trims and mouldings,and doors, all in 5 different paint colors The rooms were as follows-living room, the front entryway, the stairwell, and the upstairs and downstairs hallways. Totoal time: 3 days