Total Demolition of 2nd floor bathroom We installed new wiring and updated the outlets and installed some new plumbing. We Insulated the exterior wall. Installed moisture resistant sheetrock and 1/2 inch hardi backer concrete sheet along 2 shower walls to accept the 6x6 ceramic wall tiles. We installed 1/4 inch hardi backer on the floor to accept the new 12x12 ceramic tiles. We applied primer and 2 coats of bed and bath paint. All new fixtures were installed. Reused 1940's lights and Med. Cab.