About This Gallery
This is a complete renovation of a large basement. 1500sq.ft. Remove existing walls, redo plumbing and electrical,framing, drywall, floors, trim, mouldings, paint, doors, and woodwork. Total time 5 weeks. Florida room was an open patio. Framing, roofing, concrete, windows, flooring, paneling, trim, fans, and paint. Total time: 4 weeks.