This Bathroom remodel was done in less than a week. We completely demolished the existing vanity, toilet, floor tile, fiberglass shower unit,sink, mirror, and light. Replaced the shower valve, tub, drywall, tiled around the tub and floor, replaced the toilet, vanity, medicine cabinet, light and painted. Complete new bathroom in 5 days.