About This Gallery
This project was a complete renovation which consisted of gutting all existing plumbing and fixtures, all wall and floor tile, and repairing existing drywall. Then we installed all new plumbing fixtures with new supply lines and shut offs, new ceramic tile tub surround and flooring. The doors and trims were replaced and stained and topcoated with satin polyurethane. The walls were painted with eggshell finish paint.