About This Gallery
Primed & painted basement ceiling, walls, floor & built shelving. Added beaded paneling to finish two walls. Patched areas on conrete floor. Replaced 5 cinder blocks in an interior wall. A special feature we added by working with the plumber, was a vanity custom built for a double sink and a tiled shelf.