|
| Project Name: Install Natural Stone Tile |
| Project Location: Spokane, WA |
| Date: 02/10/2012 |
| Type of Stone: Slate |
| Stone Size: 12 x 12 or larger |
| Location of Tile Installation: Fireplace |
| Kind of Project: Replace existing tile |
| Interested in Green Alternatives: No |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Materials Provided by Customer: Yes |
| Property Owner: Yes |
| Comment: fireplace about 20-30 sq ft |
|
|
|
| Project Name: Install Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 01/31/2012 |
| Kind of Project: Tile for new construction |
| Materials Provided by Customer: Yes |
| Location of Tile Installation: Floor |
| Type of Tile: Want recommendation |
| Approx. Square Footage: 25-150 (medium) |
| Borders: Don't Know |
| Interested in Green Alternatives: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Bathroom / Laundry room in basement on concrete |
|
|
|
| Project Name: Repair Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 01/31/2012 |
| Comment: neec 30 squ ft. ceramic tile estimate. |
|
|
|
| Project Name: Install Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 01/26/2012 |
| Kind of Project: Replace existing non-tile surface |
| Materials Provided by Customer: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: bathrooms (walls and floor) and foyer floor |
|
|
|
| Project Name: Install Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 01/17/2012 |
| Kind of Project: Replace existing non-tile surface |
| Materials Provided by Customer: No |
| Location of Tile Installation: Backsplash |
| Type of Tile: Special or custom tile |
| Approx. Square Footage: Less than 25 (small) |
| Borders: No |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: i am looking to have glass tile back splash in kitchen installed as well as re-tile fireplace.. |
|
|
|
| Project Name: Install Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 12/29/2011 |
| Kind of Project: Replace existing non-tile surface |
| Materials Provided by Customer: Yes |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Install Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 11/14/2011 |
| Kind of Project: Replace existing non-tile surface |
| Materials Provided by Customer: No |
| Location of Tile Installation: Tub/Shower |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| This Request is From Another Member Pro for: My own home |
| Property Owner: Yes |
| Comment: need to tile wall from bath tub and up, tree walls all toghether |
|
|
|
| Project Name: Repair Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 11/02/2011 |
| Damage: Chipped |
| Damage: Cracked |
| Tile Location: Countertop |
| Spare Tiles: Yes |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Chipped tile counters, some re-grouting and sealing needed. |
|
|
|
| Project Name: Install Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 10/19/2011 |
| Kind of Project: Replace existing tile |
| Materials Provided by Customer: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Bathroom remodel for the tile work |
|
|
|
| Project Name: Repair Ceramic or Porcelain Tile |
| Project Location: Spokane, WA |
| Date: 10/14/2011 |
| Damage: Grout damaged or gone |
| Damage: Loose |
| Tile Location: Floor |
| Spare Tiles: Yes |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Several tiles in laundry room have the grout coming out as they as loose. Need to be taken up, area cleaned and before putting new tiles back the underflooring need to be screwed. New tiles and grout put in. <br />We have tiles and grout <br /> |
|