|
|
| Project Name: Install or Completely Replace Vinyl Siding |
| Project Location: Tipp City, OH |
| Date: 04/17/2012 |
| What type of project is this?: Replace existing siding |
| Type of Siding: Vinyl |
| Stories of Home: One story |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Completely Replace Vinyl Siding |
| Project Location: Tipp City, OH |
| Date: 02/14/2012 |
| What type of project is this?: Replace existing siding |
| Type of Siding: Vinyl |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Repair Exterior Trim |
| Project Location: Tipp City, OH |
| Date: 01/31/2012 |
| Type of Trim: Wood |
| Number of Stories: Two |
| Current siding: Asbestos |
| Water Damage or Rot on Existing Trim: Yes |
| Nature of Project: Repair or partially replace exterior trim |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: water damage not all needs replaced |
|
|
|
| Project Name: Repair or Partially Replace Traditional Stucco |
| Project Location: Tipp City, OH |
| Date: 01/16/2012 |
| Repair needs: Missing, broken, or rusty flashing. |
| Repair needs: Stucco is chipped. |
| Repair needs: Leaking water or moisture |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Repair or Partially Replace Metal Siding |
| Project Location: Tipp City, OH |
| Date: 10/06/2011 |
| Type of Siding: Aluminum |
| What type of project is this?: Repair section(s) of siding |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Wind storm ripped some the siding loose |
|
|
|
| Project Name: Repair Exterior Trim |
| Project Location: Tipp City, OH |
| Date: 09/19/2011 |
| Type of Trim: Vinyl |
| Number of Stories: One |
| Current siding: Wood panel |
| Water Damage or Rot on Existing Trim: Yes |
| Nature of Project: Repair or partially replace exterior trim |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I would like an existing wood sofit taken down over our entryway. I would like the roof insulated over the entryway and back, into the house, approximately 5 feet. I would like a vinyl soffit installed to replace it and the two existing can lights in the old soffit replaced with new ones in the new soffit. |
|
|
|
| Project Name: Install or Completely Replace Vinyl Siding |
| Project Location: Tipp City, OH |
| Date: 05/16/2011 |
| Consumer Owns Home: Yes |
| What type of project is this?: Replace existing siding |
| Type of Siding: Vinyl |
| Desired Completion Date: More than 2 weeks |
|
|
|
| Project Name: Install or Completely Replace Vinyl Siding |
| Project Location: Tipp City, OH |
| Date: 09/07/2010 |
| Comment: looking to get an est on getting some vinyl siding installed |
|
|
|
| Project Name: Install or Completely Replace Vinyl Siding |
| Project Location: Tipp City, OH |
| Date: 08/09/2010 |
| Stories of Home: One story |
| Type of Siding: Wood |
| What type of project is this?: Replace existing siding |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: home is 30 years old, replace existing eaves (3),soffitts and gutters; some water damage repair is needed |
|
|
|
| Project Name: Install or Completely Replace Vinyl Siding |
| Project Location: Tipp City, OH |
| Date: 07/25/2010 |
| Consumer Owns Home: Yes |
| What type of project is this?: Siding for a new home |
| Type of Siding: Vinyl |
| Desired Completion Date: Within 1 week |
|