|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Union, MO |
| Date: 11/18/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Unsure |
| Stories in House: One story |
| Interested in Green Alternatives: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Have one roof on seems brittle and want it removed and heavier grade shingles installed wind has blown a few off and I have repaired need done soon |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Union, MO |
| Date: 10/14/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: No |
| Stories in House: One story |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Union, MO |
| Date: 09/24/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Unsure |
| Stories in House: One story |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: estimates for installing new shingles. |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Union, MO |
| Date: 06/02/2011 |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Covered by Insurance: Yes |
| Property Owner: Yes |
| Comment: R/R GABLE 4/12 PITCH COMP ROOF 23.48 SQ ACCTUAL WITH 30 YR LAM ARC SHINGLE & FELT 26 SQ @ 10% WASTE,INC. A DORMER. NEEDS 2 - 8' LENGTHS OF SS METAL VALLEY. R & R 6 PVC TURTLE VENTS, 4 RUBBER PIPE FLASHINGS, 209 LF WHITE DRIP EDGE, D&R SAT DISH, 70 LF OF RIDGE VENT,HAUL OFF DEBRIS. ALSO NEED REMOVAL TOP GLASS DUAL PANE FOR 16 VINYL WINDOW UNITS. I HAVE NEW REPLACMENT DUAL GLASS LOW-E PANELS TO INSTALL. NEED PULL OUT, PREP FRAME, GLAZE, INSTALL AND PUT IN NEW WHITE PLASTIC EDGE TRIM. DISPOSAL OF GLASS. ALL WINDOW ON 1 STY. RANCH HOME. HAVE 5 AREAS OF 4' DUTCH LAP VINYL SIDING TO REPLACE. WILL HAVE MATCHED SIDING FROM WARRANTY & WILL COST FOR REMOVAL AND RESET OF EXISTING SIDING. HAVE 3 INTERIOR KITCHEN CABINETS TO BE RE-HUNG FROM REMOVAL FOR REF. SEEKING A CONTRACTOR WHO CAN DO ALL 4 PROJECTS. NEED SEPERATE ESTIMATE FOR EACH JOB, ROOF - WINDOW - SIDING - HANG CAB. |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Union, MO |
| Date: 05/20/2011 |
| What is the nature of this project?: Install roof on new construction |
| Select the type of roofing material you want:: Asphalt |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Union, MO |
| Date: 04/05/2011 |
| What is the nature of this project?: Completely replace roof |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Need shingle roof replaced |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Union, MO |
| Date: 03/07/2011 |
| Kind of Roof: Steel |
| What is the nature of this project?: Completely replace roof |
| Stories in House: One story |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Union, MO |
| Date: 02/05/2011 |
| Kind of Roof: Don't Know |
| Special Features: Would like recommendation |
| Special Features: Ridge vent |
| Special Features: Skylight/Solar tube |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: No |
| Stories in House: Two stories |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Considering renovation project/addition and modification and the cost versus prohibitivness of the idea or whether we are better off trying to sell and move. DK yet. |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Union, MO |
| Date: 12/30/2010 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: No |
| Stories in House: Two stories |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Special Features for Roof: Ridge vent |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Need estimates for a new roof on a 1850 sq foot two story home. Anticpate having done in March. Will require references. |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Union, MO |
| Date: 08/10/2010 |
| Number of Stories: One story |
| Repair Needed: Water stains on ceiling |
| Roof Elements: Valleys |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Emergency Service |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: roof leaking in one spot, possible flashing issue |
|