|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Kittery Point, ME |
| Date: 10/14/2011 |
| Repair Needed: Shingles are cracked, curling, missing, or loose |
| Repair Needed: Water leaking into home |
| Roof Elements: Dormers |
| Roof Elements: Valleys |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: small area of asphalt shingle roof in valley/ against dormer flashing leaks during driving rain and with snow/ice buildup. |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Kittery Point, ME |
| Date: 08/21/2011 |
| Number of Stories: Two stories |
| Repair Needed: Water stains on ceiling |
| Roof Elements: Chimneys |
| Roof Elements: Dormers |
| Roof Elements: Valleys |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: i think that the chimney flashing needs to be sealed |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Kittery Point, ME |
| Date: 07/06/2011 |
| What is the nature of this project?: Install roof on new construction |
| Select the type of roofing material you want:: Metal |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Repair a Metal Roof |
| Project Location: Kittery Point, ME |
| Date: 05/18/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Some of the insulation under the metal portion of the roof has been dislodged by wind storms. I spotted a leak in the cellar which may be traveling down the chimney wall but I can't be sure. It could be a simple fix with roofing tar around the chimney (when it stops raining!) but I would like the insulation replaced under the metal roof. |
|
|
|
| Project Name: Repair a Metal Roof |
| Project Location: Kittery Point, ME |
| Date: 05/16/2011 |
| Type of Roof: Aluminum |
| Type of Roof: Steel |
| Roof Problem: Other |
| After Business Hours: No |
| Covered by Insurance: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: The insulation seems to be deteriorated or missing and I believe there is a leak because of it. |
|
|
|
| Project Name: Repair a Metal Roof |
| Project Location: Kittery Point, ME |
| Date: 05/10/2011 |
| Type of Roof: Steel |
| Roof Problem: Other |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Some of the foam insulation under the metal roof has come out and I believe it is causing a leak. |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Kittery Point, ME |
| Date: 04/10/2011 |
| What is the nature of this project?: Completely replace roof |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Kittery Point, ME |
| Date: 02/08/2011 |
| Kind of Roof: Don't Know |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: Two stories |
| Interested in Green Alternatives: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: The back dormer of our cape gives us repeated problems. With the low slope it creates snow build-up, ice dams, and shingle damage when cleaning off the snow loads. We need this portion of the roof done in metal. The front of the house poses no problem because it is much steeper. This portion was just replaced because of age; we want the new metal roof on the back of the house to tie in to the shingled front portion at the ridge. |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Kittery Point, ME |
| Date: 04/23/2010 |
| Consumer Owns Home: Yes |
| What is the nature of this project?: Repair existing roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: Two stories |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Special Features for Roof: Ridge vent |
| Covered by Insurance: No |
| Comment: reshingle with architectural shingles. Two roofs 16 by 24 each. One <br />roof has two layers and will need to be stripped and then water and ice and then shingled. The other roof has one layer and just new over. |
|
|
|
| Project Name: Install or Replace Wood Shake or Composite Roofing |
| Project Location: Kittery Point, ME |
| Date: 03/31/2010 |
| Consumer Owns Home: Yes |
| Wood Roofing Type: Wood Shakes |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: No |
| Stories in House: Two stories |
| Interested in Green Alternatives: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: 10,5 sq. Medium Butt hand split Shakes,drip edge ,grace ice &weather shield, stainless nails,30# felt,cedar breather underlayment. Labor: Remove old shingles dispose of old materials and replace with new shingles and materials as described above. |
|