|
|
| Project Name: Install or Replace Wood Shake or Composite Roofing |
| Project Location: Estacada, OR |
| Date: 03/26/2012 |
| Consumer Owns Home: Yes |
| What is the nature of this project?: Completely replace roof |
| Select the type of roofing material you want:: Wood Shake/Composite |
| Desired Completion Date: 1 - 2 weeks |
|
|
|
| Project Name: Install or Replace Traditional Tile Roofing |
| Project Location: Estacada, OR |
| Date: 02/04/2012 |
| What is the nature of this project?: Install roof on new construction |
| Select the type of roofing material you want:: Tile |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Estacada, OR |
| Date: 12/01/2011 |
| Number of Stories: One story |
| Repair Needed: Shingles are cracked, curling, missing, or loose |
| Repair Needed: Water leaking into home |
| Repair Needed: Water stains on ceiling |
| Roof Elements: Valleys |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: 2800 triplewide, older, needs total new roof. leakage in two distinct spots in the house. About half of the chipboard/plywood will likely need replacing. gutters are still good so would need to be removed and rehung. Some soft spots. Se have funds coming sometime in December. |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Estacada, OR |
| Date: 12/01/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: One story |
| Interested in Green Alternatives: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Special Features for Roof: Would like recommendation |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Older manufactured home with leaks. About half of the board (whatever it is called) will likely need replacing. Some drywall etc in two places. 2800 SqFt. |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Estacada, OR |
| Date: 11/18/2011 |
| Kind of Roof: Don't Know |
| Special Features: Would like recommendation |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: One story |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Estacada, OR |
| Date: 11/18/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: One story |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Special Features for Roof: Gutters and downspouts |
| Special Features for Roof: Ridge vent |
| Special Features for Roof: Skylight/Solar tube |
| Special Features for Roof: Would like recommendation |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Manufactured home about 2800 sq.ft. is beginning to leak. I want a roof, carefully done with all valleys done correctly. |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Estacada, OR |
| Date: 09/15/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: One story |
| Interested in Green Alternatives: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: I had a leak by a skylight. I am unable to tell if it is fixed because the spot on my ceiling continues to be wet off and on whether it rains or not. So it appears the only way I can know for sure is to re-roof. Also I need the wet insulation removed so need a quote to have that removed & replaced as well. Thank you |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Estacada, OR |
| Date: 07/17/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: Three stories or more |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Special Features for Roof: Gutters and downspouts |
| Special Features for Roof: Heat tape |
| Special Features for Roof: Ridge vent |
| Special Features for Roof: Skylight/Solar tube |
| Special Features for Roof: Snow guards or brackets |
| Special Features for Roof: Turbine vents |
| Special Features for Roof: Water diverters |
| Special Features for Roof: Would like recommendation |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: my house is crap and needs a ton of help and money is no problem |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Estacada, OR |
| Date: 06/23/2011 |
| Consumer Owns Home: Yes |
| What is the nature of this project?: Completely replace roof |
| Select the type of roofing material you want:: Asphalt |
| Desired Completion Date: Less than 1 week |
|
|
|
| Project Name: Repair a Wood Shake or Composite Roof |
| Project Location: Estacada, OR |
| Date: 03/22/2011 |
| Number of Stories: One story |
| Roof Problem: Other |
| After Business Hours: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: on 3/13 had high wind damage from tree fall onto roof, have interior dwelling damage on ceiling drywall in two areas, tree fell between trusses. would prefer general contractor to handle everything |
|