|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Cumberland Center, ME |
| Date: 05/09/2012 |
| What is the nature of this project?: Install roof on new construction |
| Select the type of roofing material you want:: Metal |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Cumberland Center, ME |
| Date: 01/16/2012 |
| Number of Stories: Two stories |
| Repair Needed: Shingles are cracked, curling, missing, or loose |
| Roof Elements: Skylights |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: south side of garage has torn missing shingles, noticed 2 weeks ago |
|
|
|
| Project Name: Install or Replace an Asphalt Shingle Roof |
| Project Location: Cumberland Center, ME |
| Date: 11/21/2011 |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: No |
| Stories in House: Two stories |
| Interested in Green Alternatives: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: <br /> |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Cumberland Center, ME |
| Date: 11/05/2011 |
| What is the nature of this project?: Repair existing roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: Two stories |
| Interested in Green Alternatives: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Special Features for Roof: Water diverters |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Small area. Smaal lightly angled roof over entry way causing water and ice dam damage to siding and periodic internal leakage. Water needs to be redirected away from siding and probably some minor repair shingle wise. Don't think will take alot of time but need to do during clear weather next week. |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Cumberland Center, ME |
| Date: 08/08/2011 |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: need an est on getting roof flashing repair done around chimney |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Cumberland Center, ME |
| Date: 05/06/2011 |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I nned an estimate for my mothers house. Possible ice damage. Check roof ventilation, may need installation. |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Cumberland Center, ME |
| Date: 01/14/2011 |
| Kind of Roof: Standing seam |
| Special Features: Ridge vent |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: No |
| Stories in House: Two stories |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We are figuring costs for adding between 1 and 3 shed style dormers framed in, sheathed, flashed and roofed, as well as a re-roof over existing asphalt shingles. |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Cumberland Center, ME |
| Date: 01/13/2011 |
| Kind of Roof: Standing seam |
| Special Features: Ridge vent |
| Special Features: Skylight/Solar tube |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: No |
| Stories in House: Two stories |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We are thinking of installing a metal roof, we also want to install some dormers. We wouldn't want the dormers finished, but framed out and roofed with windows installed. We would do the finish shingling on the exterior, the insulation and sheet rocking on the interior. <br />We are trying to keep cost down. <br />Our roof is approximately 18 ft from eve to peak and 30 ft. long. <br />About 1,080 square feet, I think. <br />We are thinking about doing this project in the spring time. |
|
|
|
| Project Name: Install or Replace Metal Roofing |
| Project Location: Cumberland Center, ME |
| Date: 01/08/2011 |
| Kind of Roof: Copper |
| Kind of Roof: Polymer coating |
| Kind of Roof: Steel |
| Special Features: Ridge vent |
| Special Features: Skylight/Solar tube |
| What is the nature of this project?: Completely replace roof |
| Are you aware of any leaks or damage to the roof?: Unsure |
| Stories in House: Two stories |
| Interested in Green Alternatives: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: we have a cape style house with no dormers. We have explored the attic space and have found some spots are wet from condensation. We think the insulation has been installed improperly with no space for ventilation. Our roof could probably last another five years, but I am considering the cost now, to see if we could do the entire thing. |
|
|
|
| Project Name: Repair an Asphalt Shingle Roof |
| Project Location: Cumberland Center, ME |
| Date: 11/30/2010 |
| What is the nature of this project?: Repair existing roof |
| Are you aware of any leaks or damage to the roof?: Yes |
| Stories in House: Two stories |
| Select the type of roofing material you want:: Asphalt |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Need some shingle taken up and new flashing put down, re-shingle. Then repair ceiling sheetrock in garage from leak |
|