|
|
| Project Name: Install, Repair or Replace Plumbing or Fixtures |
| Project Location: Oak Grove, MO |
| Date: 03/02/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need to have a toilet unclogged. |
|
|
|
| Project Name: Clean Out a Sewer |
| Project Location: Oak Grove, MO |
| Date: 11/29/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Install, Replace or Repair a Main Sewer Pipe 4 in. blocked. |
|
|
|
| Project Name: Repair or Service a Water Heater |
| Project Location: Oak Grove, MO |
| Date: 10/22/2011 |
| Problem Description: Leaking tank |
| Heat Source for Hot Water: Natural gas |
| Size of water heater being replaced.: Other |
| Replacement: Yes |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: need to stop the leaking my floors r ruined in my laundry room from all the water |
|
|
|
| Project Name: Repair or Service a Water Heater |
| Project Location: Oak Grove, MO |
| Date: 10/16/2011 |
| Problem Description: Leaking tank |
| Heat Source for Hot Water: Natural gas |
| Size of water heater being replaced.: 50 Gallons |
| Replacement: Yes |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: leaking water on the floor had to tear tile up and now have to replace my floors dont wanna start til its stopped leaking it is a small leak |
|
|
|
| Project Name: Install, Repair or Replace Plumbing or Fixtures |
| Project Location: Oak Grove, MO |
| Date: 08/17/2011 |
| Comment: I need to add plumbing to the garage and also for a 1/2 bath just connect fixtures. |
|
|
|
| Project Name: Install, Repair or Replace Plumbing or Fixtures |
| Project Location: Oak Grove, MO |
| Date: 07/28/2011 |
| Project Description: Find and/or fix a leak |
| Plumbing Repairs: Leaking pipe |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace a Water Heater |
| Project Location: Oak Grove, MO |
| Date: 03/16/2011 |
| Type of Water Heater: Storage Tank |
| Location of Installation: Basement |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of heat source : Natural gas |
| Property Owner: Yes |
| Customer Need: Quotes - I'm ready for competing quotes |
| Comment: I need estiamtes for replacing hot water heater. |
|
|
|
| Project Name: Clear a Clogged or Slow Drain |
| Project Location: Oak Grove, MO |
| Date: 06/20/2010 |
| Problem(s): Garage or basement drain is backed up |
| Problem(s): Will not drain |
| Other drains clogged: No |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: basement drain is clogged and so is the one in garage. |
|
|
|
| Project Name: Install, Replace or Repair a Main Water Pipe |
| Project Location: Oak Grove, MO |
| Date: 05/19/2010 |
| Nature of Project: Other |
| Reason for Service: Other |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I have 3 things that need to be done. One I have a frost free hydrate next to my shop that leaks and needs to be replaced. It is in bedded in concrete. 2. I need a new refrigerator ice maker installed. 3 Is I have to have 2 more frost free hydrate installed in my yard. |
|
|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Oak Grove, MO |
| Date: 04/20/2010 |
| Consumer Owns Home: Yes |
| Type of tub install: Shower / tub combo |
| Bathtub: Replace or move existing bathtub |
| Plumbing fixtures: Yes - I plan to install new plumbing fixtures |
| Tile: Yes - I plan to install new tile |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Part of larger remodel: Yes |
|