|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Hilton Head Island, SC |
| Date: 05/18/2012 |
| Type of tub install: Shower / tub combo |
| Bathtub: Replace or move existing bathtub |
| Plumbing fixtures: Yes - I plan to install new plumbing fixtures |
| Tile: Yes - I plan to install new tile |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Part of larger remodel: Yes |
| Property Owner: Yes |
| Comment: remodeling bathroom: demo is almost complete. the only thing left to do is to remove existing bathtub before remodelling can begin. installation of new vanity, toilet, tub/shower combo, lighting, tile work, etc. is required. |
|
|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Hilton Head Island, SC |
| Date: 04/21/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Are you updating a shower or a bathtub?: Both |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: There is currently a "garden tub/shower" installed, which I want to replace with a "standard" tub/shower unit. In addition to demolition, some tile work will probably be involved. This is a second story bathroom. The remainder of the bathroom has already been updated, or will remain the same. I plan to have this work completed some time this fall. |
|
|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Hilton Head Island, SC |
| Date: 04/17/2012 |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: leaking around edge of shower area |
|
|
|
| Project Name: Install a Tankless Water Heater System |
| Project Location: Hilton Head Island, SC |
| Date: 04/16/2012 |
| When do you want to get started?: I'm flexible |
| Is this an emergency?: No |
| Type of heat source : Electric |
| Kind of Heater: Whole house |
| Comment: I have 3 water heaters and would like to consider replacing them with tankless water heaters |
|
|
|
| Project Name: Install or Replace a Water Heater |
| Project Location: Hilton Head Island, SC |
| Date: 03/27/2012 |
| Type of Water Heater: Storage Tank |
| Location of Installation: Garage |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Type of heat source : Electric |
| Property Owner: Yes |
| Is this an emergency?: No |
| Comment: Replace 30 gallon electric water heater located in garage attic. |
|
|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Hilton Head Island, SC |
| Date: 01/10/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: No |
| Are you updating a shower or a bathtub?: Bathtub |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Ceramic bathtub cracked. Needs to be replaced without changing they flooring. |
|
|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Hilton Head Island, SC |
| Date: 01/09/2012 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Interested in Green Alternatives: Yes |
| Are you updating a shower or a bathtub?: Both |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Requires Work on Historical Structure: No |
| Request for Commercial Location: No |
| Covered by Insurance: No |
| Property Owner: Yes |
| Comment: Replace shower pan with 5' bath/shower with cultured marble walls |
|
|
|
| Project Name: Install or Replace a Bathtub |
| Project Location: Hilton Head Island, SC |
| Date: 12/19/2011 |
| Type of tub install: Shower / tub combo |
| Bathtub: Replace or move existing bathtub |
| Plumbing fixtures: Yes - I plan to install new plumbing fixtures |
| Tile: No - I do not plan to install new tile |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Part of larger remodel: No |
| Property Owner: Yes |
| Comment: replace/refurbish tub plumbing |
|
|
|
| Project Name: Install or Replace a Shower |
| Project Location: Hilton Head Island, SC |
| Date: 11/22/2011 |
| Type of shower install: Free-standing shower |
| Shower: Replace or move existing shower |
| Plumbing fixtures: No - I do not plan to install new plumbing fixtures |
| Tile: No - I do not plan to install new tile |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Part of larger remodel: No |
| Property Owner: Yes |
| Comment: Need to replace shower pan <br /> |
|
|
|
| Project Name: Install or Replace a Shower |
| Project Location: Hilton Head Island, SC |
| Date: 08/11/2011 |
| Shower: Replace or move existing shower |
| Plumbing fixtures: No - I do not plan to install new plumbing fixtures |
| Tile: Yes - I plan to install new tile |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Part of larger remodel: Yes |
| Property Owner: Yes |
| Comment: remolded shower and we have low pressure and small leak |
|