|
|
| Project Name: Install or Replace a Water Heater |
| Project Location: Dousman, WI |
| Date: 01/23/2012 |
| Type of Water Heater: Storage Tank |
| Desired Completion Date: Emergency Service |
| Request Stage: Ready to Hire |
| Type of heat source : Natural gas |
| Customer Need: Emergency Service - I have an urgent need |
| Comment: I need an estimate for replacing a natural gas water heater, 30 gallon, |
|
|
|
| Project Name: Install, Repair or Replace Plumbing or Fixtures |
| Project Location: Dousman, WI |
| Date: 10/22/2011 |
| Project Description: Repair a faulty plumbing item |
| Plumbing Repairs: Item not working properly |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| After Business Hours: No |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: My faucet to my tub in my bathroom in running hot water 24 hours a day. I can' t get it to shut off at all. Not just a drip thinking I may need a new gasket in there. |
|
|
|
| Project Name: Install, Repair or Replace Plumbing or Fixtures |
| Project Location: Dousman, WI |
| Date: 09/02/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need to have some plumbing repair done at my mobile home - we seem to have a leak and can't figure out just where it is. |
|
|
|
| Project Name: Install or Replace a Shower |
| Project Location: Dousman, WI |
| Date: 08/18/2011 |
| Shower / Bath: Yes - I want to move or install a new shower or bath |
| Toilet: No - I will keep the existing toilet as is |
| Cabinets / Vanity: No - I do not plan to update the cabinets / vanity |
| Countertops: No - I do not plan to update the countertops |
| Sinks: No - I do not plan to update the sinks |
| Flooring: No - I do not plan to update the flooring |
| Extensiveness of Remodel: I plan to maintain existing bathroom floorplan |
| Are you updating a shower or a bathtub?: Shower |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Comment: I need a shower pan and sorround installed and need written estimates. |
|
|
|
| Project Name: Install Plumbing in a Remodel or Addition |
| Project Location: Dousman, WI |
| Date: 07/19/2011 |
| Type of Project: Install in new addition |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install Plumbing in a Remodel or Addition |
| Project Location: Dousman, WI |
| Date: 01/19/2011 |
| Wall Access: All walls will be exposed |
| Rooms Included: Bathroom(s) |
| Plumbing Fixtures Needed: Toilet |
| Plumbing Fixtures Needed: Pedestal sink |
| Plumbing Fixtures Needed: Shower/Tub |
| Plumbing Fixtures Needed: None (Rough-in) |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: adding a bathroom to an existing second floor space. plumbing is run to second floor already, but needs to be run across a hallway to bathroom space. need drains installed for toilet, shower and two pedestal sinks. please include quotes with and without fixture installs. we will be taking care of tiling and drywall ourselves |
|
|
|
| Project Name: Install or Replace a Water Heater |
| Project Location: Dousman, WI |
| Date: 12/29/2010 |
| Type of Water Heater: Storage Tank |
| Location of Installation: Basement |
| Is this an emergency need?: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Type of heat source : Propane |
| Property Owner: Yes |
| Comment: Replace 2 40 gal propane tall water heaters in basement. 16 yrs old. Both functional now. Not a rush. |
|
|
|
| Project Name: Install, Repair or Replace Plumbing or Fixtures |
| Project Location: Dousman, WI |
| Date: 12/09/2010 |
| Comment: Oustside faucets re leaking and interior stops are not closing all the way |
|
|
|
| Project Name: Install Plumbing in a Remodel or Addition |
| Project Location: Dousman, WI |
| Date: 05/10/2010 |
| Consumer Owns Home: Yes |
| Wall Access: Partial wall access |
| Rooms Included: Kitchen |
| Type of Project: Install in new addition |
| Plumbing Fixtures Needed: Other fixtures |
| Appliances Needed: None (Rough-in) |
| Historical Work: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Kitchen is remodled, but need install of prep sink. Have sink and partial H2O connection. Need it completed. It is part of a island. |
|
|
|
| Project Name: Install or Replace a Shower |
| Project Location: Dousman, WI |
| Date: 01/27/2010 |
| Consumer Owns Home: Yes |
| Type of shower install: Shower / tub combo |
| Shower: Replace or move existing shower |
| Plumbing fixtures: Yes - I plan to install new plumbing fixtures |
| Tile: No - I do not plan to install new tile |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Part of larger remodel: Yes |
| Comment: replace existing shower/tub with new shower surround and multiple sprayer system both will be provided by owner. Drain pipe and water pipe will need to be increased in size, but the mechanical room is located on other side of wall with the larger drain and water supply. |
|