|
|
| Project Name: Install, Spread or Scrape Gravel or Loose Fill Paving- For Business |
| Project Location: New York, NY |
| Date: 01/25/2012 |
| Type of Loose Fill: Gravel |
| Nature of Project: Install new loose fill |
| What kind of location is this?: Business |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Parking lot |
|
|
|
| Project Name: Install Asphalt Paving- For Business |
| Project Location: New York, NY |
| Date: 01/10/2012 |
| Project Type: Replacement of existing surface |
| What kind of location is this?: Business |
| Timing: Within 1 Week |
| Type of Business: Other |
| For how many locations/units is this request?: 1 |
| Comment: Need estimate for paving |
|
|
|
| Project Name: Install Asphalt Paving- For Business |
| Project Location: New York, NY |
| Date: 01/07/2012 |
| Area Description: Driveway |
| Existing Surface: Asphalt |
| What kind of location is this?: Business |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: There are some holes in the driveway aarea that need to be filled and to even the area |
|
|
|
| Project Name: Repair or Patch Asphalt Paving |
| Project Location: New York, NY |
| Date: 11/18/2011 |
| Area Description: Walkway or sidewalk |
| Work Needed: Fill cracks |
| Work Needed: Fill potholes |
| Work Needed: Remove old asphalt |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We are looking for a contractor provide us two proposals, one is only patch the pothole on sidewalk; another one is replaced the entire building front sidewalk. |
|
|
|
| Project Name: Repair or Patch Asphalt Paving- For Business |
| Project Location: New York, NY |
| Date: 10/21/2011 |
| Area Description: Other |
| Work Needed: Fill cracks |
| Work Needed: Repair settled area |
| Slope of Area: Flat |
| What kind of location is this?: Business |
| For how many locations/units is this request?: 1 |
| Comment: Estimate to have our asphalt playground repaired/replaced please |
|
|
|
| Project Name: Install Asphalt Paving- For Business |
| Project Location: New York, NY |
| Date: 10/17/2011 |
| Area Description: Parking Lot |
| Project Type: Replacement of existing surface |
| What kind of location is this?: Business |
| Timing: Timing is flexible |
| Type of Business: Retail/Restaurant |
| For how many locations/units is this request?: 1 |
| On-going: No |
| Comment: I need an estimate on installing paving for a parking lot. |
|
|
|
| Project Name: Install Asphalt Paving- For Business |
| Project Location: New York, NY |
| Date: 10/13/2011 |
| Area Description: Road |
| Existing Surface: Gravel or road base |
| Project Type: New asphalt for existing building |
| What kind of location is this?: Business |
| Timing: Within 1 Week |
| Type of Business: Government/Municipality |
| For how many locations/units is this request?: 1 |
| On-going: No |
| Comment: Install asphalt paving for Lane construction. |
|
|
|
| Project Name: Repair or Patch Asphalt Paving- For Business |
| Project Location: New York, NY |
| Date: 10/13/2011 |
| Area Description: Other |
| What kind of location is this?: Business |
| Comment: need an est to have school playground black topped |
|
|
|
| Project Name: Install, Spread or Scrape Gravel or Loose Fill Paving |
| Project Location: New York, NY |
| Date: 09/20/2011 |
| Description of Area: Walkway or sidewalk |
| Type of Loose Fill: Pebbles |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: need 3/8 inch yellow pea gravel delivered to NYC for a 6 x 7 space 2.5 inches deep. |
|
|
|
| Project Name: Repair or Patch Asphalt Paving |
| Project Location: New York, NY |
| Date: 09/20/2011 |
| Area Description: Parking lot |
| Work Needed: Repair settled area |
| Slope of Area: Steep grade |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Its a common driveway and drive way towards middle has become a sink hole. Need to install trench drain temporarily to keep water from flowing into homeowners back yards, while budget is figured out to re-do whole driveway. thx alex |
|