|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Pooler, GA |
| Date: 02/07/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 1 - 2 |
| Comment: I+am+looking+for+quotes+to+paint+a+large+wall+in+my+stairway. |
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Pooler, GA |
| Date: 02/07/2012 |
| House Occupancy: Furnished and unoccupied |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Number of Rooms: 1 - 2 |
| Painting Needs:: Walls and ceilings |
| Comment: car garage |
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: Pooler, GA |
| Date: 02/07/2012 |
| Stories of Home: Two stories |
| Type of Project: Repaint |
| Types of Surfaces: Siding |
| Interested in Green Alternatives: No |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Rust from a broken AC unit dripped onto roof, and down side of house causing the paint to be stained a rust color. |
|
|
|
| Project Name: Powerwash Exterior Surfaces |
| Project Location: Pooler, GA |
| Date: 01/19/2012 |
| Description of area: Other |
| Why Power Washing is Needed: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Towards the end of may. Pressure wash the exterior of my home. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Pooler, GA |
| Date: 01/16/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 3 - 4 |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Pooler, GA |
| Date: 01/16/2012 |
|
|
|
| Project Name: Apply Textured Paint Finishes |
| Project Location: Pooler, GA |
| Date: 12/15/2011 |
| Texture needed: Repair/Patch drywall |
| Surface: Ceiling(s) |
| Surface: Wall(s) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: need repair to drywall and texture on ceiling <br /> |
|
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: Pooler, GA |
| Date: 11/18/2011 |
| Stories of Home: One story |
| Type of Project: Restain |
| Types of Surfaces: Doors |
| Interested in Green Alternatives: Yes |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: one door and siding restained and varnished, repaint 6 shutters |
|
|
|
| Project Name: Powerwash Exterior Surfaces |
| Project Location: Pooler, GA |
| Date: 11/11/2011 |
| Description of area: Side of building |
| Why Power Washing is Needed: Remove mold or moss |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need my house pressure washed: 3000 sq-ft; two story; in Pooler |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Pooler, GA |
| Date: 11/07/2011 |
| Rooms to be Painted: Bathroom(s) |
| Rooms to be Painted: Bedroom(s) |
| Rooms to be Painted: Hallways |
| Rooms to be Painted: Kitchen |
| Rooms to be Painted: Living areas |
| Rooms to be Painted: Stairways |
| House Occupancy: Empty of furnishings and unoccupied |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 10 or more |
| Painting Needs:: Walls and ceilings |
| Comment: This will be an interior job of a newly constructed home. 8 and 9 ft. ceilings. Paint walls, ceilings, and trim. Faux finish in kitchen. Rooms will be living, dining, kitchen, foyer, stairway with high ceiling, 3 bedrooms one with tray ceiling, loft area, and 3 bathrooms. Walls will be painted an off white by contractor. |
|