|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: New River, AZ |
| Date: 01/09/2012 |
| Rooms to be Painted: Bedroom(s) |
| House Occupancy: Empty of furnishings and unoccupied |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Number of Rooms: 1 - 2 |
| Painting Needs:: Walls |
| Comment: room size 12'4" x 12', 9 ft floor to ceiling |
|
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: New River, AZ |
| Date: 10/19/2011 |
| Comment: i need an estimate for painting the ouside of my house its a block house with stucco |
|
|
|
| Project Name: Paint or Stain Single Items or Small Rooms |
| Project Location: New River, AZ |
| Date: 11/23/2010 |
| Type of project: Paint |
| New color: Same or similar to existing color |
| Features to be painted/stained: Interior walls |
| Features to be painted/stained: Interior wood trim |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: water damage in garage and 2 bedrooms. all dry need repair and paint. Ins. claim |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: New River, AZ |
| Date: 11/18/2010 |
| Rooms to be Painted: Whole house |
| House Occupancy: Empty of furnishings and unoccupied |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 6 - 9 |
| Painting Needs:: Walls |
| Comment: Purchasing a new house and needing interior painting |
|
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: New River, AZ |
| Date: 06/22/2010 |
| Stories of Home: Two stories |
| Type of Project: Repaint |
| Types of Surfaces: Siding |
| Types of Surfaces: Trim |
| Problems: Peeling or flaking paint |
| Problems: Bare wood |
| Problems: Cracks |
| Problems: Rusty nails |
| Problems: Trim pulling away from house |
| Problems: Water damage |
| Interested in Green Alternatives: No |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Need whole house redone from a bad contractors job. They used ceramicoat paint and plus oversprayed on a new roof. Wood also needs replaced. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: New River, AZ |
| Date: 06/03/2010 |
| Rooms to be Painted: Kitchen |
| Rooms to be Painted: Living areas |
| Rooms to be Painted: Stairways |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Number of Rooms: 3 - 5 |
| Painting Needs:: Walls and ceilings |
| Consumer Need: Consultation: Looking to discuss my options for this project |
| Comment: I have the paint already need somebody to paint walls and cielings in my kitchen, dining and living room which all 3 are connected no walls in between but there is a stair case. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: New River, AZ |
| Date: 03/23/2010 |
| Rooms to be Painted: Hallways |
| Rooms to be Painted: Stairways |
| Consumer Owns Home: Yes |
| House Occupancy: Furnished and occupied |
| Interested in Green Alternatives: No |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 3 - 5 |
| Painting Needs:: Walls |
| Comment: I own the "Spirit" model & need to have the hallway from the garage entry & up the stairs & half of the hallway upstairs painted. Possibly the laundry room & guest room depending upon the cost. |
|
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: New River, AZ |
| Date: 01/08/2010 |
| Stories of Home: One story |
| Type of Project: Repaint |
| Consumer Owns Home: Yes |
| Types of Surfaces: Siding |
| Types of Surfaces: Trim |
| Problems: Peeling or flaking paint |
| Problems: Bare wood |
| Interested in Green Alternatives: No |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Eaves need scraping, rest of house not in bad shape |
|
|
|
| Project Name: Paint or Stain Single Items or Small Rooms |
| Project Location: New River, AZ |
| Date: 01/06/2010 |
| Consumer Owns Home: Yes |
| Type of project: Paint exterior |
| Surface types: Previously painted with latex (water based) paint or stain |
| New color: Same or similar to existing color |
| Features to be painted/stained: Exterior wood trim |
| Request is for Commercial Location: No |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Need 2 bids. One for the entire house, and the other, for the eves and top part of the house. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: New River, AZ |
| Date: 01/06/2010 |
| Rooms to be Painted: Bathroom(s) |
| Rooms to be Painted: Bedroom(s) |
| Consumer Owns Home: Yes |
| House Occupancy: Furnished and occupied |
| Number of Rooms to be Painted: 2 |
| Interested in Green Alternatives: Yes |
| Request is for Commercial Location: No |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: Nine foot walls. New Home... Need one wall in bedroom and all of bath painted. |
|