|
|
| Project Name: Powerwash Exterior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 05/08/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: powerwashhouse |
|
|
|
| Project Name: Powerwash Exterior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 05/01/2012 |
| Description of area: Side of building |
| Why Power Washing is Needed: Remove mold or moss |
| What kind of location is this?: Home/Residence |
| What are you looking for?: Price Quotes |
| Is this an emergency need?: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Basic vinyl siding cleaning |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 04/18/2012 |
| Rooms to be Painted: Whole house |
| House Occupancy: Empty of furnishings and unoccupied |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Number of Rooms: 7 - 8 |
| Painting Needs:: Walls and ceilings |
| Comment: I need to paint complete interior of 2200 sq. ft. |
|
|
|
| Project Name: Powerwash Exterior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 04/11/2012 |
| Description of area: Side of building |
| Why Power Washing is Needed: Remove mold or moss |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: 1400 sq ft home A framed needs powerwashed. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 04/06/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Number of Rooms: 3 - 4 |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 01/17/2012 |
| Rooms to be Painted: Whole house |
| House Occupancy: Empty of furnishings and unoccupied |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 10 or more |
| Painting Needs:: Walls |
| Comment: 5 bedroom/5.5 bath condo needs painting to get ready for beach rental season; 1 color on walls (eggshell) and 1 color on trim (semi gloss). Need work completed within 5 days. Owners to select paint. |
|
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 01/01/2012 |
| Stories of Home: One story |
| Type of Project: Repaint |
| Types of Surfaces: Siding |
| Types of Surfaces: Trim |
| Problems: Peeling or flaking paint |
| Problems: Bare wood |
| Problems: Cracks |
| Problems: Trim pulling away from house |
| Interested in Green Alternatives: No |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: We are interested in having the exterior of the house painted a different color than it is now, including the trim. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 12/10/2011 |
| Rooms to be Painted: Kitchen |
| House Occupancy: Furnished and occupied |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Painting Needs:: Walls |
| Comment: need to have kitchen painted asap have all supplies including paint <br /> <br /> |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 11/25/2011 |
| Rooms to be Painted: Bedroom(s) |
| Rooms to be Painted: Hallways |
| Rooms to be Painted: Kitchen |
| Rooms to be Painted: Living areas |
| House Occupancy: Furnished and occupied |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 3 - 5 |
| Painting Needs:: Other |
| Comment: Paint walls in LR, entry, dining room-before this is done I want to get an estimate on having chair molding in DR, and window molding around all windows. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Murrells Inlet, SC |
| Date: 10/21/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I want to paint my stairwells, the landing, stairs, and railings. this is a concrete stair with metal railings |
|