|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: Luling, LA |
| Date: 05/10/2012 |
| Comment: I need an estimate on paiting the exterior of my (stucco and siding.) |
|
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: Luling, LA |
| Date: 04/18/2012 |
| Type of Project: Repaint |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Powerwash Exterior Surfaces |
| Project Location: Luling, LA |
| Date: 12/26/2011 |
| Description of area: Side of building |
| Why Power Washing is Needed: Remove mold or moss |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: Two-story house; top is aluminum siding; bottom is brick; biggest problem is mildew, but there is also normal dirt and grime; in 2 or 3 spots, there are brown stains of unknown substances; timing is flexible, but would prefer no earlier than late January |
|
|
|
| Project Name: Paint, Varnish or Stain Exterior Surfaces |
| Project Location: Luling, LA |
| Date: 08/18/2011 |
| Stories of Home: Two stories |
| Type of Project: Repaint |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Mostly brick home with some stucco. Stucco is half painted, but we can't reach the 2nd story. Small one day job, but will need proper equipment (scaffolding or other) to be able to get to higher section. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Luling, LA |
| Date: 03/15/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: interior+living%2C+kitchen%2C+hall%2C+bath%2C+and+1+bedroom.+approx.+1120+square+ft. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Luling, LA |
| Date: 02/25/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: need an est on getting foyer painted and some other rooms as well |
|
|
|
| Project Name: Paint or Stain Single Items or Small Rooms |
| Project Location: Luling, LA |
| Date: 09/11/2010 |
| Type of project: Paint |
| New color: Darker than existing color |
| Features to be painted/stained: Interior walls |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Luling, LA |
| Date: 05/18/2010 |
| Rooms to be Painted: Bathroom(s) |
| Rooms to be Painted: Bedroom(s) |
| Rooms to be Painted: Hallways |
| House Occupancy: Furnished and occupied |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Number of Rooms: 6 - 9 |
| Painting Needs:: Walls and ceilings |
| Comment: need to paint the entire house (interior)but at this time we would like to start with the upstairs only. 3 bedrooms and one full bath and the hallway. Considering the ceilings also. Next project will be to paint the downstairs which consist of the kitchen, dining, living room, foyer, utility and 1/2 bathroom. |
|
|
|
| Project Name: Paint, Varnish or Stain Interior Surfaces |
| Project Location: Luling, LA |
| Date: 04/29/2010 |
| Consumer Owns Home: Yes |
| Desired Completion Date: 1 - 2 weeks |
|
|
|
| Project Name: Paint or Stain Single Items or Small Rooms |
| Project Location: Luling, LA |
| Date: 03/30/2010 |
| Consumer Owns Home: Yes |
| Type of project: Paint |
| New color: Same or similar to existing color |
| Features to be painted/stained: Interior walls |
| Request is for Commercial Location: No |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Master bedroom and one smaller bedroom. Master bedroom has a tray ceiling, other bedroom is eight feet. |
|