|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Williston, VT |
| Date: 04/18/2012 |
| Reason For Test: Can smell it |
| Reason For Test: Evidence of water / dampness |
| Reason For Test: Cold, allergy or asthma symptoms |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Suspected Area: Basement or crawl space |
| Suspected Area: Don't know |
| Suspected Area: Interior walls or ceiling |
|
|
|
| Project Name: Eliminate or Contain Radon Gas |
| Project Location: Williston, VT |
| Date: 04/12/2012 |
| Why Reduce Radon: Tests showed dangerous levels of radon are present |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Test Indoor Air Quality |
| Project Location: Williston, VT |
| Date: 03/08/2012 |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Williston, VT |
| Date: 02/06/2012 |
| Reason For Test: Can see it |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Suspected Area: Basement or crawl space |
| Suspected Area: Interior walls or ceiling |
| Comment: Want to paint walls that only have had contractor base/primer coat but looks like we have either mildew or mold on exterior walls of finished basement. |
|
|
|
| Project Name: Test Indoor Air Quality |
| Project Location: Williston, VT |
| Date: 02/04/2011 |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Reason for test: Family member(s) suffer cold, allergy, or asthma symptoms |
| Reason for test: Odor elimination |
| Comment: neighbor's smoke infiltrating my home |
|
|
|
| Project Name: Eliminate Toxic Materials or Mold |
| Project Location: Williston, VT |
| Date: 09/09/2010 |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Tested for Mold: No |
| Location of Mold: Basement or crawl space |
| Reason for Removal: Odor |
| Comment: Bedroom in basement. |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Williston, VT |
| Date: 09/08/2010 |
| Reason For Test: Can smell it |
| Reason For Test: Cold, allergy or asthma symptoms |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Suspected Area: Basement or crawl space |
| Suspected Area: Ducts and/or heating & air system |
| Suspected Area: Flooring |
| Comment: Myself and my children have asthma and it seems to be worse inside the home. We are renting, but there is a very strong smell like mustyness, mold, or even animal urine that I can smell when entering my home. I am noticing my kids have cold-like symtoms almost all of the time as well. |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Williston, VT |
| Date: 09/03/2010 |
| Reason For Test: Can see it |
| Reason For Test: Purchasing property |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Suspected Area: Attic |
| Suspected Area: Other |
| Comment: Getting ready to buy home and see evidence of mold in the garage walls and in the attic |
|
|
|
| Project Name: Eliminate or Contain Radon Gas |
| Project Location: Williston, VT |
| Date: 01/03/2010 |
| Home Construction Type: Below grade basement with concrete slab |
| Signs of Cracking: No |
| Why Reduce Radon: Tests showed dangerous levels of radon are present |
| Ventilation in Basement: Yes |
| Substance Giving Reading: Soil |
| Request is for Commercial Location: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: Radon remediation, hole in concrete floor, vent to outside, fan moving the air. |
|