|
| Project Name: Eliminate or Contain Radon Gas |
| Project Location: Nashville, TN |
| Date: 05/26/2012 |
| Why Reduce Radon: Requested by a buyer or seller of property |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Comment: radon level 13up in home i am under contract to buy....am taking bids. the home is three stories with the lowest level being 1/2 embedded into ground incline.......other is walkout onto patio or simply above ground. would like pricing estimate....home 2600 s.f. built on a slab. |
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Nashville, TN |
| Date: 05/24/2012 |
| Comment: can see it mold and asbestos testing and removal |
|
|
|
| Project Name: Eliminate Toxic Materials or Mold |
| Project Location: Nashville, TN |
| Date: 05/23/2012 |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Location of Mold: Basement or crawl space |
| Location of Mold: Interior walls or ceiling |
| Reason for Removal: Just want it removed |
| Comment: na |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Nashville, TN |
| Date: 05/23/2012 |
| Reason For Test: Selling a property |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Suspected Area: Ducts and/or heating & air system |
|
|
|
| Project Name: Eliminate Toxic Materials or Mold |
| Project Location: Nashville, TN |
| Date: 05/22/2012 |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: Yes |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Tested for Mold: No |
| Location of Mold: Basement or crawl space |
| Location of Mold: Interior walls or ceiling |
| Reason for Removal: Evidence of water / dampness |
| Reason for Removal: Cold, allergy or asthma symptoms |
| Reason for Removal: Just want it removed |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Nashville, TN |
| Date: 05/17/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: I am needing a mold testing |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Nashville, TN |
| Date: 05/14/2012 |
| Reason For Test: Other |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Suspected Area: Other |
| Comment: Refinancing home and new lender wants Mold Inspection Letter. Had some minor damage due to leaking HVAC unit, so they want to be sure no major issue. |
|
|
|
| Project Name: Eliminate or Contain Radon Gas |
| Project Location: Nashville, TN |
| Date: 05/09/2012 |
| Why Reduce Radon: To ensure safety |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Nashville, TN |
| Date: 05/07/2012 |
| Reason For Test: Cold, allergy or asthma symptoms |
| Reason For Test: Just want to have property tested |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Suspected Area: Basement or crawl space |
| Comment: would like to have home tested for mold. |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Nashville, TN |
| Date: 05/07/2012 |
| Reason For Test: Can see it |
| Reason For Test: Other |
| Reason For Test: Evidence of water / dampness |
| What kind of location is this?: Business |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Suspected Area: Basement or crawl space |
| Suspected Area: Interior walls or ceiling |
| Comment: Water damage in 3 areas of the church. The basement(ground water seepage through cinderblock, East wing exterior wall (water entering through roof inbetween sheetrock and brick), and missing flashing on steeple allow water damage to exterior wall. All three areas we want tested for possible mold contamination before begining any repairs. |
|