|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Brighton, MI |
| Date: 05/12/2012 |
| Reason For Test: Can see it |
| Reason For Test: Evidence of water / dampness |
| Reason For Test: Cold, allergy or asthma symptoms |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Suspected Area: Attic |
| Suspected Area: Ducts and/or heating & air system |
| Suspected Area: Interior walls or ceiling |
| Comment: We just moved into a rental home. The roof is in bad shape and we just noticed that we can see the wood studs through drywall in master. We are all coughing since we have moved in. Something isn't right. We want service right away so we can get out of this lease if there is a problem. I am pregnant and have a 2 year old son. |
|
|
|
| Project Name: Eliminate Asbestos |
| Project Location: Brighton, MI |
| Date: 04/25/2012 |
| Asbestos Materials Needing Removal: Other |
| Asbestos Test Done?: Yes |
| What kind of location is this?: Business |
| Is this an emergency?: No |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Demolition of a duplex in a commercial C2 lot. Needs pipe wrap removed. |
|
|
|
| Project Name: Eliminate Toxic Materials or Mold |
| Project Location: Brighton, MI |
| Date: 04/09/2012 |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Tested for Mold: Yes |
| Location of Mold: Attic |
| Reason for Removal: Just want it removed |
| Comment: Mold in attack due to improperly vented bathroom fan. Venting has been corrected but mold remains. |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Brighton, MI |
| Date: 03/04/2012 |
| Reason For Test: Cold, allergy or asthma symptoms |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Suspected Area: Basement or crawl space |
| Suspected Area: Ducts and/or heating & air system |
| Comment: laundry room and furnace area |
|
|
|
| Project Name: Eliminate Toxic Materials or Mold |
| Project Location: Brighton, MI |
| Date: 02/14/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Tested for Mold: No |
| Location of Mold: Basement or crawl space |
| Location of Mold: Ducts and/or heating & air system |
| Reason for Removal: Odor |
| Reason for Removal: Other |
| Reason for Removal: Evidence of water / dampness |
| Reason for Removal: Cold, allergy or asthma symptoms |
| Comment: thw water softener id draining into the crawl space |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Brighton, MI |
| Date: 01/21/2012 |
| Reason For Test: Cold, allergy or asthma symptoms |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Suspected Area: Basement or crawl space |
| Suspected Area: Flooring |
| Suspected Area: Interior walls or ceiling |
| Comment: we seem to get cold and sinus problems frequently |
|
|
|
| Project Name: Eliminate or Contain Radon Gas |
| Project Location: Brighton, MI |
| Date: 01/11/2012 |
| Why Reduce Radon: Tests showed dangerous levels of radon are present |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: we have found that the radon gas concentration is 7 and want to install a fan exhaust system. |
|
|
|
| Project Name: Eliminate Toxic Materials or Mold |
| Project Location: Brighton, MI |
| Date: 01/02/2012 |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Tested for Mold: No |
| Location of Mold: Other |
| Reason for Removal: Selling a property |
| Reason for Removal: Just want it removed |
| Comment: Mold in shower. Had problems applying sealant and since then have seen increase in mold growth. |
|
|
|
| Project Name: Test for Toxic Materials & Mold |
| Project Location: Brighton, MI |
| Date: 12/26/2011 |
| Reason For Test: Cold, allergy or asthma symptoms |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Suspected Area: Don't know |
| Comment: constant sinus infections/allergies, and thought i might be from mold. |
|
|
|
| Project Name: Eliminate Toxic Materials or Mold |
| Project Location: Brighton, MI |
| Date: 12/18/2011 |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Tested for Mold: No |
| Location of Mold: Basement or crawl space |
| Reason for Removal: Just want it removed |
| Comment: Found what appears to be black mold on the rafters of the basement ceiling. |
|