|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 05/19/2012 |
| Type of Stairs: Exterior |
| Stair Construction: Other |
| Type of Material: Don't Know |
| Width of Stairs: 3-5 ft. |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 05/12/2012 |
| Type of Stairs: Exterior |
| Stair Construction: Open on no sides (railings on no sides, just a hand rail) |
| Type of Material: Painted |
| Type of Material: Powder coated |
| Type of Material: Stainless Steel |
| Width of Stairs: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: I would like to put a metal stair rail on the steps leading from my house to the street. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 04/27/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Estimate please - metal railings for a sidewalk with a curb - about 100' - want to meet with you on Monday if at all possible |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 04/08/2012 |
| Type of Stairs: Interior |
| Stair Construction: Other |
| Type of Material: Don't Know |
| Width of Stairs: Other |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: building a new house in north tacoma want metal staircase and wood stairs,call me xxxxxxxxxxxx |
|
|
|
| Project Name: Repair Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 02/29/2012 |
| Type of Stairs: Interior |
| Description of Problem: New railing needed |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: I am getting bids on putting in a iron and wood stairway railing going to the downstairs. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 02/07/2012 |
| Type of Stairs: Interior |
| Type of Stairs: Straight |
| Stair Construction: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: I have iron stair railing and a railing from the living room that are not up to code. I have a 17mo old child that can fit under and in between. |
|
|
|
| Project Name: Weld or Cut Metal with a Torch |
| Project Location: Tacoma, WA |
| Date: 12/06/2011 |
| Type of Welding Project: Attachment |
| What item: NA |
| Location of Welding: Service professional will do work at customer's site |
| What kind of location is this?: Business |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: <br /><br /><br /> <br /><br /> <br /> |
|
|
|
| Project Name: Fabricate Custom Metal Objects |
| Project Location: Tacoma, WA |
| Date: 11/17/2011 |
| Type of Metal Desired: Don't know--would appreciate advice |
| What kind of location is this?: Business |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Project Descripiton: N/A |
| Comment: In my college engineering course I am designing a book collection box. I was hoping for a price quote. Were planning with 1/8" steel, I need two 46"x46" plates with 2" 90degree bends on all 4 sides, two 54"x50" with two 90 bends on the 50" side. Two 54"x46" plates, one with a 24"x4" slot cut 75% of the way up and the other with a hinged door 3" in from the edge. Lipped edges should have 3 equally spaced bolt holes drilled out for assembly. I only have rough sketches right now but am starting a CAD working drawing which may help you. If there is any more information you need please email me anytime. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 06/20/2011 |
| Type of Stairs: Exterior |
| Stair Construction: Open on two sides (railings on both sides) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: Looking to rebuild wooden stairs to meet code with metal handrails on both sides and on concrete stairs to the street. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Tacoma, WA |
| Date: 05/23/2011 |
| Type of Stairs: Exterior |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Material: Wrought iron |
| Width of Stairs: 5-7 ft. |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I would like to install a new railing |
|