|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 05/23/2012 |
| Type of Stairs: Exterior |
| Type of Stairs: Open risers (no risers) |
| Type of Stairs: Spiral |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Material: Galvanized steel |
| Width of Stairs: 3-5 ft. |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: Egress stair off 4th floor bedroom. Top landing to be +/- 32ft above grade. Probably requires a couple of "rest" platforms at two lower floor levels. Egress is only for top floor. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 05/22/2012 |
| Type of Stairs: Circular |
| Type of Stairs: Exterior |
| Type of Stairs: Open risers (no risers) |
| Stair Construction: Open on two sides (railings on both sides) |
| Type of Material: Wrought iron |
| Width of Stairs: Less than 3 ft. |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Spiral staircase approx 11'4" from deck to garden. Concern is code compliance. This is the ground floor one bedroom unit of a small apt house. City informally says if it is a ground floor unit, a spiral staircase as the second exit is ok. However, we are on a slope so that the front entrance of unit is on ground floor, street level, but the back of the unit maybe won't be regarded as "ground floor" because we are on a slope. The patio doors from unit open on to a deck that is 11 feet above the garden. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 04/28/2012 |
| Type of Stairs: Circular |
| Type of Stairs: Exterior |
| Type of Stairs: Open risers (no risers) |
| Stair Construction: Open on two sides (railings on both sides) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Replace current deck stairs |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 04/27/2012 |
| Type of Stairs: Exterior |
| Type of Material: Don't Know |
| Width of Stairs: 3-5 ft. |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: REPLACE ALL OR SOME OF BACK STAIRS -4 STORY HOME |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 04/27/2012 |
| Type of Stairs: Interior |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Material: Stainless Steel |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Incomplete stainless steel interior railing project. Frame is complete and ready for cable installation. Some cable wire and hardware on site. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 04/21/2012 |
| Type of Stairs: Exterior |
| Type of Stairs: Spiral |
| Stair Construction: Open on two sides (railings on both sides) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I have an exterior space that has a 30' retaining wall to a three story house. I would like a 3 story spiral staircase installed to connect the bottom area to our top deck. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 04/19/2012 |
| Type of Stairs: Circular |
| Type of Stairs: Exterior |
| Stair Construction: Other |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: spiral staircase to connect deck to patio |
|
|
|
| Project Name: Repair Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 03/30/2012 |
| Type of Stairs: Exterior |
| Type of Stairs: Landing mid-stair |
| Type of Stairs: Other |
| Type of Material: Don't Know |
| Type of Material: Galvanized steel |
| Description of Problem: Other |
| What kind of location is this?: Business |
| Historical Work: Yes |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Repair or replace the steps or set of chairs ( per landing or per step). Will also need replacement for the rail |
|
|
|
| Project Name: Repair Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 03/22/2012 |
| Comment: I have some iron railings that need to be replaced at our hotel - I need to get an estimate for this. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: San Francisco, CA |
| Date: 03/30/2011 |
| Type of Stairs: Exterior |
| Type of Stairs: Landing mid-stair |
| Type of Stairs: Straight |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Material: Raw steel |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Insurance requested handrail and railings between 2 detached homes, approx 9ft flat , 20 l/f stairs,4ft flat and 20 l/f stairs to finish. paint grade please. approx 53 linear feet. <br />Needs to be secured to concrete steps. manufacture only please. Rob Graham RMG Construction xxxxxxxxxxxx |
|