|
|
| Project Name: Fabricate Custom Metal Objects |
| Project Location: Mesa, AZ |
| Date: 12/24/2011 |
| Type of Metal Desired: Don't know--would appreciate advice |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Project Descripiton: N/A |
| Comment: need custom kitchen table legs fabricated for kitchen table, same design as end tables |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Mesa, AZ |
| Date: 12/14/2011 |
| What kind of location is this?: Business |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: I need a metal railing installed inside a commercial location. |
|
|
|
| Project Name: Weld or Cut Metal with a Torch |
| Project Location: Mesa, AZ |
| Date: 08/25/2011 |
| Type of Welding Project: Attachment |
| What item: NA |
| Location of Welding: Consumer will bring item to shop |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Mesa, AZ |
| Date: 08/11/2011 |
| Type of Stairs: Interior |
| Type of Stairs: Straight |
| Stair Construction: Open on one side (railing on one side, wall on the other) |
| Type of Material: Painted |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I need a 6 foot long handrail that can only be 2 feet tall. |
|
|
|
| Project Name: Weld or Cut Metal with a Torch |
| Project Location: Mesa, AZ |
| Date: 10/28/2010 |
| Type of Welding Project: Repair |
| What item: NA |
| Location of Welding: Service professional will do work at customer's site |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Weld or Cut Metal with a Torch |
| Project Location: Mesa, AZ |
| Date: 04/11/2010 |
| Type of Welding Project: Fabrication |
| What item: NA |
| Location of Welding: Other |
| Request is for Commercial Location: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: I would like a metal rod to be hung outside to hang curtains (fabric) as a sun screen. The fabric will have grommets to allow the curtains to open/close and tied back to columns. I would like the rod to have a slight radius to it. |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Mesa, AZ |
| Date: 03/26/2010 |
| Consumer Owns Home: Yes |
| Type of Stairs: Interior |
| Type of Stairs: Other |
| Stair Construction: Open on no sides (railings on no sides, just a hand rail) |
| Type of Material: Powder coated |
| Width of Stairs: 3-5 ft. |
| Request is for Commercial Location: No |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Need hand rails for a church |
|
|
|
| Project Name: Install or Replace Metal Stairs and Railings |
| Project Location: Mesa, AZ |
| Date: 03/22/2010 |
| Comment: I need to get an estimate on some railings |
|
|
|
| Project Name: Weld or Cut Metal with a Torch |
| Project Location: Mesa, AZ |
| Date: 02/22/2010 |
| Type of Welding Project: Attachment |
| What item: NA |
| Location of Welding: Other |
| Request is for Commercial Location: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: metal fab |
|
|
|
| Project Name: Fabricate Custom Steel Beams |
| Project Location: Mesa, AZ |
| Date: 02/15/2010 |
| Consumer Owns Home: Yes |
| What Beam Supports: Roof structure only |
| Where Beam Used: Other |
| Deliver beam?: Yes |
| Request is for Commercial Location: No |
| Financing Requested: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: to be used on a patio, will only have a roof with role roofing material on it, span needed 21 foot |
|