|
|
| Project Name: Install Sod |
| Project Location: Alpine, UT |
| Date: 02/11/2012 |
| Grading required: Yes |
| Old surface removal: Old grass or weeds |
| Size of area needing sod: Large (3,000 - 10,000 sq ft) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Remove old lawn and replace with new including sprinklers |
|
|
|
| Project Name: Add or Remove Holiday Lighting |
| Project Location: Alpine, UT |
| Date: 12/28/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Will you provide lights?: No |
| Comment: Add lights to two gazebos. |
|
|
|
| Project Name: Add or Remove Holiday Lighting - For Business |
| Project Location: Alpine, UT |
| Date: 12/02/2011 |
| What kind of location is this?: Home/Residence |
| Timing: Within 1 Week |
| Design Work: Would like recommendation |
|
|
|
| Project Name: Add or Remove Holiday Lighting |
| Project Location: Alpine, UT |
| Date: 11/28/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Decorative Elements Desired: Exterior |
| Property Owner: Yes |
| Will you provide lights?: No |
| Comment: want lights on the outside of our house |
|
|
|
| Project Name: Grade or Reslope Grounds for Landscaping |
| Project Location: Alpine, UT |
| Date: 09/01/2011 |
| Purpose of Grading: Improving existing drainage |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: We have water problems in the basement and need to build up around the house and slant away from the house for better drainage. We will need grass and shrubs |
|
|
|
| Project Name: Grade or Reslope Grounds for Landscaping |
| Project Location: Alpine, UT |
| Date: 08/05/2011 |
| Purpose of Grading: Drainage before installing landscaping |
| Surveyed and Drawings Complete: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Large yard at my personal residence (1 acre lot) needs slope adjustment, drainage correction, and possibly rock retention in preparation for landscaping. |
|
|
|
| Project Name: Landscape Yard or Gardens |
| Project Location: Alpine, UT |
| Date: 05/19/2011 |
| Landscaping to be installed: Grass |
| Landscaping to be installed: Masonry (brick and/or stone work) |
| Landscaping to be installed: Special planting area/Garden |
| Landscaping to be installed: Sprinkler system |
| Landscaping to be installed: Trees/Shrubs |
| Design Preparation: Have a basic idea of what I want |
| Areas to be Landscaped: Back yard |
| Areas to be Landscaped: Side yard(s) |
| Historical Work: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Grading, sprinkler install/repair, sod install, planter bed install, edging install, paver patio install. |
|
|
|
| Project Name: Deliver Soil, Sand, Mulch and Rock |
| Project Location: Alpine, UT |
| Date: 05/10/2011 |
| Product Needed: Mulch or Bark |
| Size of area: Medium (1,000 - 3,000 sq ft) |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Bark for Flower Beds |
|
|
|
| Project Name: Landscape Yard or Gardens |
| Project Location: Alpine, UT |
| Date: 04/05/2011 |
| Landscaping to be installed: Grass |
| Landscaping to be installed: Retaining wall |
| Landscaping to be installed: Sprinkler system |
| Landscaping to be installed: Trees/Shrubs |
| Design Preparation: Need design/plant suggestions |
| Areas to be Landscaped: Side yard(s) |
| Historical Work: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Remove gravel parking area and install raise perinial bed shrubs trees and pathway |
|
|
|
| Project Name: Install Sod |
| Project Location: Alpine, UT |
| Date: 02/09/2011 |
| Grading required: Don't Know |
| Old surface removal: Old grass or weeds |
| Size of area needing sod: Large (3,000 - 10,000 sq ft) |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I need to have some landscape work completed. |
|