|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Bear, DE |
| Date: 11/20/2011 |
| Nature of Project: Insulation for existing home |
| Location of Installation: Ceiling |
| Location of Installation: Foundation walls |
| Location of Installation: Masonry walls |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Comment: Garage walls are dry walled without insulation. The master bedroom is above the garage. The back area of garage is used as a rereation area and needs insulation. |
|
|
|
| Project Name: Install or Upgrade Batt, Rolled or Reflective Insulation |
| Project Location: Bear, DE |
| Date: 11/10/2011 |
| Nature of Project: Insulation for new construction/addition |
| Type of Insulation: Batts |
| Location of Installation: Ceiling |
| Location of Installation: Non-masonry walls |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Need to insulate new detached garage 30'x54'....10'x 2x6 walls & 14'x2x6 walls....16" I-joist ceiling & a 2x6 ceiling joist. |
|
|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Bear, DE |
| Date: 07/25/2011 |
| Nature of Project: Insulation for existing home |
| Location of Installation: Attic |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install Spray Foam Insulation |
| Project Location: Bear, DE |
| Date: 06/30/2011 |
| Nature of Project: Insulation for existing home |
| Location of Installation: Attic |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Area Description: Wall framing is exposed / unfinished |
| Comment: need insulation applied to back side of bedroom wall and master bath to form a warm zone |
|
|
|
| Project Name: Install Spray Foam Insulation |
| Project Location: Bear, DE |
| Date: 05/10/2011 |
| Nature of Project: Repair/Replace existing insulation |
| Location of Installation: Ceiling |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Area Description: Wall framing is exposed / unfinished |
| Comment: Improve insulation in an attached two-car garage ceiling with bedroom above. Insufficient insulation that results in bedroom above the garage to remain cold during the winter. Would prefer spray foam insulation that would also at as a vapor barrier. Job would include removal of existing drywall on ceiling, adding insulation, and installation of new drywall. |
|
|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Bear, DE |
| Date: 04/06/2011 |
| Comment: Need attic insulation added (blown insulation) |
|
|
|
| Project Name: Install Spray Foam Insulation |
| Project Location: Bear, DE |
| Date: 03/31/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I would like to have an estimate for installing insulation for my home. I want spray foam installed on the ceiling of the garage. The bathroom is a bit chilly above it. |
|
|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Bear, DE |
| Date: 02/26/2011 |
| Nature of Project: Insulation for existing home |
| Location of Installation: Masonry walls |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Ground floor rear insulation |
|
|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Bear, DE |
| Date: 04/15/2010 |
| Consumer Owns Home: Yes |
| Nature of Project: Repair/Replace existing insulation |
| Location of Installation: Attic |
| Location of Installation: Floor |
| Interested in Green Alternatives: Yes |
| Request is for Commercial Location: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: Would like to get estimates for upgrading existing insulation in attic with a higher r-rating. Also, want estimates for installing insulation in basement rafters between basement and 1st floor. Approx 1400sqft in attic and approx 1400sqft in basement. |
|
|
|
| Project Name: Install or Upgrade Batt, Rolled or Reflective Insulation |
| Project Location: Bear, DE |
| Date: 04/09/2010 |
| Consumer Owns Home: Yes |
| Request is for Commercial Location: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Comment: new insulation for a mobile home |
|