|
| Project Name: Install Spray Foam Insulation |
| Project Location: Asheville, NC |
| Date: 02/10/2012 |
| Nature of Project: Insulation for existing home |
| Location of Installation: Masonry walls |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Area Description: No framing exposed - walls to remain intact |
| Comment: updating my mothers home after gutting the bathrooms realized there was no insolation in the exterior walls a must with energy cost today thought this would be the best and easier spraying in foam than ? taking down the sheetrock in the entire house, single level brick ranch probably 60 long by 24w thas a guess, im assuming a spray foam can be used or hope so instead of a blown. |
|
|
|
| Project Name: Soundproof a Room or Window |
| Project Location: Asheville, NC |
| Date: 01/25/2012 |
| Type of Noise: Loud music |
| Soundproofing Locations: Walls |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: music room I am trying to soundproof. Located in the basement |
|
|
|
| Project Name: Soundproof a Room or Window |
| Project Location: Asheville, NC |
| Date: 01/12/2012 |
| Type of Noise: Loud music |
| Soundproofing Locations: Floors |
| Soundproofing Locations: Walls |
| Soundproofing Locations: Windows |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: I am a drummer and want to have a encloser built to be able to play with NO sound outside the encloser. |
|
|
|
| Project Name: Install or Upgrade Batt, Rolled or Reflective Insulation |
| Project Location: Asheville, NC |
| Date: 11/27/2011 |
| Comment: i need a quote on remove blown in insulation and re-install new insulation...need advise..... ( coming thru can lights...a lot of insulation dust ) this is in our attic area..... would like rolled, batt, reflective.....need advise..not blown in..... 2 level home... home.. i am the home owner.... |
|
|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Asheville, NC |
| Date: 11/14/2011 |
| Comment: Est on blown insulating in attic |
|
|
|
| Project Name: Install or Upgrade Batt, Rolled or Reflective Insulation |
| Project Location: Asheville, NC |
| Date: 11/11/2011 |
| Nature of Project: Insulation for existing home |
| Type of Insulation: Want recommendation |
| Location of Installation: Floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: full daylight basement needs insulation on "ceiling" which is underneath side of upstairs floors. |
|
|
|
| Project Name: Install or Upgrade Batt, Rolled or Reflective Insulation |
| Project Location: Asheville, NC |
| Date: 11/08/2011 |
| Nature of Project: Insulation for existing home |
| Type of Insulation: Rolled |
| Location of Installation: Floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Insulation under house for floors for approximately 950 square foot house. |
|
|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Asheville, NC |
| Date: 10/20/2011 |
| Comment: I need insulation updated. Attic. |
|
|
|
| Project Name: Install or Upgrade Blown-In Insulation |
| Project Location: Asheville, NC |
| Date: 10/14/2011 |
| Nature of Project: Insulation for existing home |
| Location of Installation: Attic |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: about 1400 square feet is needed. |
|
|
|
| Project Name: Install Spray Foam Insulation |
| Project Location: Asheville, NC |
| Date: 10/10/2011 |
| Nature of Project: Insulation for existing home |
| Location of Installation: Floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Area Description: Not sure |
| Comment: Older home with dug out crawl space (dirt floor)and exposed joists. Interior flooring was installed directly onto the joists with no plywood/advantec. As a result - spaces in the interior flooring cause direct exposure to crawl. |
|