|
|
| Project Name: Install or Replace Gutter Covers and Accessories |
| Project Location: Los Altos, CA |
| Date: 01/22/2012 |
| Number of Stories: Two stories |
| Problems Description: Leaves and debris are building up in the gutter |
| Accessories Needed: Gutter covers |
| What kind of location is this?: Home/Residence |
| Materials Provided by Homeowner: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: clean leaf and install gutter cover for my house |
|
|
|
| Project Name: Install or Replace Gutter Covers and Accessories |
| Project Location: Los Altos, CA |
| Date: 01/04/2012 |
| Number of Stories: Two stories |
| Problems Description: Leaves and debris are building in the downspout |
| Problems Description: Leaves and debris are building up in the gutter |
| Accessories Needed: Wire mesh leaf guards over exposed gutter area |
| What kind of location is this?: Home/Residence |
| Materials Provided by Homeowner: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I need to have gutter covers installed to prevent pine needles and pine tree debris from entering the gutters. Pine needles are a concern for 1/4 or the gutters, the rest is just leaves. |
|
|
|
| Project Name: Install or Replace Seamless Metal Gutters |
| Project Location: Los Altos, CA |
| Date: 12/07/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| How many stories is your house?: 1 |
| Project Description: Replace existing gutters |
|
|
|
| Project Name: Repair or Replace Section of Galvanized Gutters |
| Project Location: Los Altos, CA |
| Date: 10/17/2011 |
| Comment: Need estimate on gutter repair |
|
|
|
| Project Name: Install or Replace Seamless Metal Gutters |
| Project Location: Los Altos, CA |
| Date: 10/12/2011 |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| How many stories is your house?: 1 |
| Project Description: Install new gutters where there are none |
| Property Owner: Yes |
| Comment: About 40ft seamless gutter |
|
|
|
| Project Name: Install or Replace Seamless Metal Gutters |
| Project Location: Los Altos, CA |
| Date: 10/06/2011 |
| Interested in Green Alternatives: Yes |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| How many stories is your house?: 1 |
| Project Description: Replace existing gutters |
| Property Owner: Yes |
| Comment: I believe all the gutters should be replaced but maybe not. There are some that are leaking. Gutters are 25 years old. you can check out home on Zillow.com for size etc. single story, attached garage. |
|
|
|
| Project Name: Install or Replace Seamless Metal Gutters |
| Project Location: Los Altos, CA |
| Date: 09/24/2011 |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| How many stories is your house?: 2 |
| Project Description: Replace existing gutters |
| Property Owner: Yes |
| Comment: replace existing gutters on front of house <br /> |
|
|
|
| Project Name: Install or Completely Replace Galvanized Gutters |
| Project Location: Los Altos, CA |
| Date: 09/08/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Install Flashing and gutter on 10ft diagonal of down-sloped Spanish tile roof edge. On this 10 foot section remove remaining seven, 1/2 wave tiles that were used to hide this section's not-to code finish. <br />Fill this roof edge/down slope diagonal section's Spanish tile wave end gaps with aluminum sheathing in same style as rest of home <br /> <br />Additionally tune up connecting 8 foot gutter section, adding rt-angle flashing (between roof edge and gutter), and adjusting slope of gutter for drainage. <br /> <br />Additionally give separate quote for 18foot, 10ft, and 60ft roof end-point/gutter sections to install missing the right-angle flashing between the roof edge and gutters. <br /> <br /> |
|
|
|
| Project Name: Install or Replace Gutter Covers and Accessories |
| Project Location: Los Altos, CA |
| Date: 08/10/2011 |
| What kind of location is this?: Home/Residence |
| Materials Provided by Homeowner: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Want estimate for new covered gutters and downspouts installed. Must be painted black to match trim on the house. Run is 290 Linear feet. House is two story with gutters on two levels. Would like estimate by 8/19/11. Hope to have job complete by 10/15/11. Thanks for your assistance. |
|
|
|
| Project Name: Install or Replace Seamless Metal Gutters |
| Project Location: Los Altos, CA |
| Date: 07/16/2011 |
| Interested in Green Alternatives: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| How many stories is your house?: 1 |
| Project Description: Install new gutters where there are none |
| Property Owner: Yes |
|