|
|
| Project Name: Install or Replace Window Glass |
| Project Location: Xenia, OH |
| Date: 12/07/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Emergency Service |
| Request Stage: Ready to Hire |
| Type of Repair Required: Glass |
| Items Requiring Repair: Install New Glass |
| Type of Window: Bay |
| Window Frame Material: Wood |
| Comment: <br /><br /> <br /> |
|
|
|
| Project Name: Install or Replace a Shower Door or Enclosure |
| Project Location: Xenia, OH |
| Date: 08/31/2011 |
| Type of enclosure: Shower |
| Door and Panel Types: Frameless (3/8" or 1/2" glass) |
| Glass Type: Obscured |
| Configuration: Hinged door with 2 adjacent fixed glass panels |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: needed glass 5x5 shower door hinged with panels on either side, door in the middle obscured |
|
|
|
| Project Name: Install or Replace Window Glass |
| Project Location: Xenia, OH |
| Date: 06/04/2011 |
| Nature of Project: Repair Window Glass |
| Number of Windows: 1 |
| Type of Window: Bay/Bow |
| Window Frame Material: Aluminum |
| Interested in Green Alternatives: Yes |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: front picture window |
|
|
|
| Project Name: Install or Replace Window Glass |
| Project Location: Xenia, OH |
| Date: 04/27/2011 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Glass |
| Items Requiring Repair: Install New Glass |
| Items Requiring Repair: Moisture between panes of glass |
| Type of Window: Double-hung (both halves open) |
| Window Frame Material: Vinyl |
| Comment: The middle part of my window has a large crack in it which is causing water to get in between the windows. Need middle glass section replaced. |
|
|
|
| Project Name: Install or Replace Window Glass |
| Project Location: Xenia, OH |
| Date: 11/18/2010 |
| Consumer Owns Home: Yes |
| Nature of Project: Repair Window Glass |
| Number of Windows: 6 - 9 |
| Desired Completion Date: Within 1 week |
|
|
|
| Project Name: Apply or Replace Window Tinting - For Business |
| Project Location: Xenia, OH |
| Date: 09/10/2010 |
| Comment: need an est on replacing old tinting on a bank |
|
|
|
| Project Name: Install or Replace Window Glass |
| Project Location: Xenia, OH |
| Date: 09/04/2010 |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Type of Repair Required: Glass |
| Comment: I need an estimate on getting my glass window replaced on a business |
|
|
|
| Project Name: Install or Replace Window Glass |
| Project Location: Xenia, OH |
| Date: 08/16/2010 |
| After Business Hours: No |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Repair Required: Glass |
| Items Requiring Repair: Install New Glass |
| Items Requiring Repair: Crank Malfunction |
| Comment: I have appox. 10 triple pane windows fogging[weathersheild] one that requires totao replacement and two bank of windows that have the headers rotted out , a few windows need new cranks |
|
|
|
| Project Name: Repair Existing Shower Door or Enclosure |
| Project Location: Xenia, OH |
| Date: 06/24/2010 |
| Repair needed: Door or glass panel leaks |
| Purpose of enclosure: Shower |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: replace both the inclosure and install new shower doors..original was tile, want to replace with plastic stall. |
|
|
|
| Project Name: Repair Existing Shower Door or Enclosure |
| Project Location: Xenia, OH |
| Date: 06/01/2010 |
| Repair needed: Door or glass panel leaks |
| Purpose of enclosure: Shower |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: During a shower, water runs from the shower door onto floor. |
|