|
| Project Name: Build a Garage |
| Project Location: Santa Rosa, CA |
| Date: 05/29/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Santa Rosa, CA |
| Date: 04/16/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Wants to have epoxy on garage floor installed |
|
|
|
| Project Name: Build a Garage |
| Project Location: Santa Rosa, CA |
| Date: 04/15/2012 |
| Size of Garage: One car |
| Garage Features: Designed to match house or building |
| Garage Features: Electricity |
| Garage Features: Extra room for storage and/or work area |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Garage: Stand alone building |
| Comment: We have an old house that never had a garage.We need a free standing garage to take the place of the shed that we have. |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Santa Rosa, CA |
| Date: 04/10/2012 |
| Surface Condition: Smooth |
| Area of Coverage: 400 sq ft - 800 sq ft |
| Existing Coatings: Yes |
| Surface Location: Basement floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: I have a in-law unit with concrete floors part of which were previously partially coated with concrete stain (2 coats in some locations) . I wish to have the floor finished in an epoxy coating. |
|
|
|
| Project Name: Install or Replace a Garage Door |
| Project Location: Santa Rosa, CA |
| Date: 04/06/2012 |
| Need garage door opener?: Yes, need existing system re-installed |
| Kind of Garage Door: Double car garage door |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer - For Business |
| Project Location: Santa Rosa, CA |
| Date: 04/03/2012 |
| Surface Condition: Rough |
| Area of Coverage: Greater than 800 sq ft |
| Existing Coatings: No |
| Surface Location: Intererior surface |
| What kind of location is this?: Business |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Commercial Kitchen for a Sandwich Shop. Existing concrete slab, ready for health dept. approved finish surface. 1/4" min thick troweled on epoxy. |
|
|
|
| Project Name: Build a Garage |
| Project Location: Santa Rosa, CA |
| Date: 03/17/2012 |
| Design Preparation: None |
| Garage Features: Electricity |
| Garage Features: Insulation |
| Garage Features: Plumbing |
| Garage Features: Windows |
| Garage Features: Extra room for storage and/or work area |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Garage: Extension of house or building |
| Property Owner: Yes |
| Comment: We have a one car garage comfortable enough for a simple studio. We need it to be compact and efficient , nothing over the top. A shower, sink , toilet , and floor not carpet. |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Santa Rosa, CA |
| Date: 03/13/2012 |
| Surface Condition: Small fissures |
| Existing Coatings: Yes |
| Surface Location: Garage floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: garage has oil spills on floor. It needs a thourough cleaning. I have cabinets so there is very little that needs to be moved except the two cars. |
|
|
|
| Project Name: Repair a Garage Door |
| Project Location: Santa Rosa, CA |
| Date: 02/27/2012 |
| Type of Garage Door: Aluminum |
| Repair Needs: Broken springs (door will not go up) |
| Type of Garage Door: Sectional roll up |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Santa Rosa, CA |
| Date: 02/24/2012 |
| Request is for Commercial Location: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|