|
|
| Project Name: Install or Replace a Garage Door |
| Project Location: Incline Village, NV |
| Date: 05/20/2012 |
| Type of garage door: Aluminum |
| Kind of Garage Door: Single car garage door |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Comment: Need two single car slide up garage doors instead of old solid wood ones. |
|
|
|
| Project Name: Build a Garage |
| Project Location: Incline Village, NV |
| Date: 05/08/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Garage: Extension of house or building |
| Comment: Add two-car garage to northwest corner of home in Incline Village |
|
|
|
| Project Name: Install or Replace a Garage Door |
| Project Location: Incline Village, NV |
| Date: 05/04/2012 |
| Type of garage door: Custom (wood application) |
| Need garage door opener?: Don't Know |
| Kind of Garage Door: Double car garage door |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Replace exisitng separate twin 7ft ht by 8ft wide garage doors with single double wide 7ft ht by 18ft wide gargae door. |
|
|
|
| Project Name: Repair or Adjust a Garage Door Opener |
| Project Location: Incline Village, NV |
| Date: 11/22/2011 |
| Comment: I need an estimate for garage door opener repair' |
|
|
|
| Project Name: Install or Replace a Garage Door |
| Project Location: Incline Village, NV |
| Date: 11/15/2011 |
| Type of garage door: Sectional |
| Type of garage door: Steel |
| Need garage door opener?: Yes, need new system installed |
| Kind of Garage Door: Double car garage door |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Replace 2- existing wood 8' x 7- wood garage doors and openers with steel insulated doors and new openers. |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Incline Village, NV |
| Date: 11/15/2011 |
| Surface Condition: Large uneven crevices |
| Area of Coverage: 400 sq ft - 800 sq ft |
| Existing Coatings: No |
| Surface Location: Garage floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Repair and epoxy coat the garage floor. Floor is approximately 20' x 23'. |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Incline Village, NV |
| Date: 07/11/2011 |
| Surface Condition: Smooth |
| Area of Coverage: Greater than 800 sq ft |
| Existing Coatings: No |
| Surface Location: Garage floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: 2 garages, currently empty, 1 garage fits 4 cars the other 2 cars. No poles or obstructions. The only ventilation is via the garage door, there are no opening windows. |
|
|
|
| Project Name: Install or Replace a Garage Door |
| Project Location: Incline Village, NV |
| Date: 07/01/2011 |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Comment: We+are+replacing+old%2C+worn+out+2+garage+doors+in+the+front+of+the+house.+Openers+would+be+nice.+We+want+completed+before+winter. |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Incline Village, NV |
| Date: 06/22/2011 |
| Area of Coverage: 100 sq ft - 400 sq ft |
| Surface Location: Garage floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Estimate - Garage floor is cracked and needs resurfacing, 2 car 20 years old, |
|
|
|
| Project Name: Coat Concrete Floors with Epoxy or Hybrid Polymer |
| Project Location: Incline Village, NV |
| Date: 06/15/2011 |
| Surface Condition: Rough |
| Area of Coverage: 400 sq ft - 800 sq ft |
| Existing Coatings: Don't Know |
| Surface Location: Garage floor |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Two car garge floor decomposing from salt and water damage. Want to clean and seal. |
|