|
| Project Name: Build a Garage |
| Project Location: Fountain Inn, SC |
| Date: 05/29/2012 |
| Design Preparation: None |
| Size of Garage: Specialty layout |
| Garage Features: Automatic garage door opener |
| Garage Features: Drywall |
| Garage Features: Electricity |
| Garage Features: Insulation |
| Garage Features: Plumbing |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Garage: Stand alone building |
| Property Owner: Yes |
| Comment: A garage to hold 4 vehicles and have concrete fooring. |
|
|
|
| Project Name: Repair a Garage Door |
| Project Location: Fountain Inn, SC |
| Date: 05/09/2012 |
| What kind of location is this?: Home/Residence |
| Is this an emergency?: No |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: Estimate- for garage door repair |
|
|
|
| Project Name: Build a Garage |
| Project Location: Fountain Inn, SC |
| Date: 04/22/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Type of Garage: Stand alone building |
| Comment: free standing open carport, gererous width for 2 or maybe 3 cars, 5 pitch roof, shingles, 6 poles on side, no center poles, want it open sides generous hang over, want ceiling covered, no electrical insidethanksb |
|
|
|
| Project Name: Build a Metal Carport |
| Project Location: Fountain Inn, SC |
| Date: 03/15/2012 |
| Location of Carport: Other |
| What kind of location is this?: Business |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: wanting a quote for a 20 ft. by 20 ft. aluminuim roof with only 4 cornerpost to be used for a smoking area shelter. |
|
|
|
| Project Name: Build a Garage |
| Project Location: Fountain Inn, SC |
| Date: 03/01/2012 |
| Size of Garage: Two car |
| Garage Features: Automatic garage door opener |
| Garage Features: Designed to match house or building |
| Garage Features: Drywall |
| Garage Features: Electricity |
| Garage Features: Insulation |
| Garage Features: Plumbing |
| Garage Features: Windows |
| Garage Features: Extra room for storage and/or work area |
| Garage Features: Extra tall for special vehicles |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Garage: Stand alone building |
| Comment: Want to build a garage that will blend in with current brick home. Must have a stall to hold a 25 foot class C motorhome and a Ford F150 SUpper Crew truck |
|
|
|
| Project Name: Build a Garage |
| Project Location: Fountain Inn, SC |
| Date: 02/11/2012 |
| Size of Garage: Two car |
| Garage Features: Automatic garage door opener |
| Garage Features: Designed to match house or building |
| Garage Features: Drywall |
| Garage Features: Electricity |
| Garage Features: Extra room for storage and/or work area |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Garage: Extension of house or building |
| Comment: two cars,with master suit upstairs |
|
|
|
| Project Name: Repair a Garage Door |
| Project Location: Fountain Inn, SC |
| Date: 12/20/2011 |
| Type of Garage Door: Vinyl |
| Repair Needs: Door damaged, broken, dented, etc. |
| Repair Needs: Rollers out of tracks |
| Type of Garage Door: One piece tilt up |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Comment: roller is off |
|
|
|
| Project Name: Build a Garage |
| Project Location: Fountain Inn, SC |
| Date: 10/29/2011 |
| Size of Garage: Three car |
| Garage Features: Automatic garage door opener |
| Garage Features: Windows |
| Garage Features: Extra room for storage and/or work area |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Type of Garage: Stand alone building |
|
|
|
| Project Name: Repair a Garage Door |
| Project Location: Fountain Inn, SC |
| Date: 07/20/2011 |
| Repair Needs: Damaged sections |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: I need an estimate for repairing a garage door for one of my tenents. |
|
|
|
| Project Name: Build a Garage |
| Project Location: Fountain Inn, SC |
| Date: 05/18/2011 |
| Design Preparation: Architectural drawings complete |
| Size of Garage: Three car |
| Garage Features: Designed to match house or building |
| Garage Features: Drywall |
| Garage Features: Electricity |
| Garage Features: Windows |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 months |
| Request Stage: Planning & Budgeting |
| Type of Garage: Extension of house or building |
| Property Owner: Yes |
|