| Project Name: Install a New Concrete Foundation |
| Project Location: Commerce Township, MI |
| Date: 04/26/2012 |
| Structural drawings exist for project: Yes |
| Type of Foundation: Poured concrete basement |
| Purpose of Foundation: Foundation for a new home |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: It is a 40' x 30' basment with 9' poured concrete walls with a walk out in the back where it will be 4' high wall in the back 15' from either side of the 40' and then brought down 10' in the middle for the walkout |
|
|
|
| Project Name: Install a New Concrete Foundation |
| Project Location: Commerce Township, MI |
| Date: 04/10/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: I need an estimate to have a foundation for a house we are going to built. |
|
|
|
| Project Name: Waterproof a Basement or Foundation |
| Project Location: Commerce Township, MI |
| Date: 02/09/2012 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Comment: we need to have someoen address a puddle of water that shows up in our basement |
|
|
|
| Project Name: Waterproof a Basement or Foundation |
| Project Location: Commerce Township, MI |
| Date: 08/09/2011 |
| Condition of Foundation: Wall is not exposed |
| Problems: Basement flooding |
| Problems: Mold, mildew, and/or fungus |
| Problems: Mud or clay silt surfacing inside |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
|
|
|
| Project Name: Install or Replace Foundation Drains |
| Project Location: Commerce Township, MI |
| Date: 06/05/2011 |
| Nature of Project: Repair of existing drainage system |
| Reason for Drains: Concrete shifting or cracking |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Install or Replace Foundation Drains |
| Project Location: Commerce Township, MI |
| Date: 05/15/2011 |
| Foundation Condition: Wall is exposed |
| Nature of Project: Repair of existing drainage system |
| Reason for Drains: Basement floods during storms |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: The sump pump drainage pipe on the outside of the house broke underground right next to the foundation and would flood the immediate area, then drain right back into the sump. I either need the existing drainage pipe repaired or a new pipe installed. |
|
|
|
| Project Name: Install Basement Surface Drainage Channels |
| Project Location: Commerce Township, MI |
| Date: 05/04/2011 |
| Reason for Channel Installation: Basement floods during storms |
| Reason for Channel Installation: Rising water table floods basement |
| Type of Channels: Want Recommendation |
| Needs sump pump: Yes |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Install or Replace Foundation Drains |
| Project Location: Commerce Township, MI |
| Date: 04/05/2011 |
| Foundation Condition: Wall is not exposed |
| Nature of Project: Installation of new drainage system |
| Reason for Drains: Water leaks through walls |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Need french drain installed in yard to remove excess water accumulation |
|
|
|
| Project Name: Waterproof a Basement or Foundation |
| Project Location: Commerce Township, MI |
| Date: 01/10/2011 |
| Condition of Foundation: Wall is exposed |
| Kind of Foundation: Concrete block foundation |
| Problems: White powder or spots on walls |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: SINDER BLOCK WALLS IN BASEMENT LOOKS THEY HAVE A LIME OR SALT WHIT POWER SUBSTANCE |
|
|
|
| Project Name: Waterproof a Basement or Foundation |
| Project Location: Commerce Township, MI |
| Date: 06/21/2010 |
| Condition of Foundation: Wall is exposed |
| Kind of Foundation: Poured concrete basement |
| Problems: Discoloration, odors, or rust |
| Problems: Excessive dampness |
| Problems: Hairline cracks |
| Problems: Mold, mildew, and/or fungus |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: been smelling some kind of moisture order and dampness I know its not healthy for my son who has bad allergy's need to fix it before it gets to be a problem |
|