|
|
| Project Name: Install a New Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 01/31/2012 |
| Structural drawings exist for project: Yes |
| Purpose of Foundation: Foundation for a new home |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Comment: custom home with livable space of 4300 sqft |
|
|
|
| Project Name: Repair a Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 01/04/2012 |
| Damage Repair Type: Foundation cracked or broken |
| Size of Area: Less than 1 sq ft |
| Presence of Water: Don't Know |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: There is small area (few inches long) where the concrete is chipped. It's not just paint. Its a chunk of cement + rock. I would like to know if its is something that needs to be repaired. Then I would also like to find out if there is any type of settling going on around the house. |
|
|
|
| Project Name: Raise a Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 12/23/2011 |
| Damage Repair Type: Foundation is settling and needs to be raised |
| Presence of Water: Don't Know |
| What kind of location is this?: Business |
| Covered by Insurance: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: No |
| Comment: This is a warehouse belong to my friend. And He is asking me to find the solution for him. If the price is reasonable and you can guarantee the fix, they could decide very quickly. The building is about 100 ft deep X 500 feet wide. With concrete slab walls, roof and floors. Some of the divisions in the middle is dry wall. The truck deck (rear side of the building)side is OK but the front side of the floor is about .5"to 1" lower. This is evident as compared to the bottom of the slab wall. Need to know if you can fix it and how? I was told that it can be fixed by drilling several 4"to 6" holes near the lower side and then pump the concrete mix thru these holes, to raise the floor. The floor can be raised using the high pressure concrete mix. |
|
|
|
| Project Name: Raise a Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 12/14/2011 |
| Damage Repair Type: Foundation is settling and needs to be raised |
| Presence of Water: No |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: I have about 3 sections of concrete sloping toward my house where rain accumulates and would like to get them raised. This is painted and designed concrete <br /> |
|
|
|
| Project Name: Repair a Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 12/04/2011 |
| Damage Repair Type: Foundation cracked or broken |
| Size of Area: 2 - 5 sq ft |
| Presence of Water: Yes |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Financing Requested: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
|
|
|
| Project Name: Repair a Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 11/30/2011 |
| Damage Repair Type: Wall is tipping |
| Size of Area: 2 - 5 sq ft |
| Presence of Water: No |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Financing Requested: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: "Pillar" or post(?) that is supposed to be attached to the house on one side, and attached to a gate on the other side is leaning away from the house. On the other side the gate is attached to slump block wall that goes to next door neighbor properly. I would like to get the "piller(?)" pushed back up against the house, stuccoed or whatever so it is attached. The pillar/post is square approx 18"x18" and 6'(?). <br /> <br />Thanks |
|
|
|
| Project Name: Install a New Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 11/15/2011 |
| Structural drawings exist for project: Yes |
| Type of Foundation: Poured concrete slab foundation |
| Purpose of Foundation: Foundation for a mobile home |
| What kind of location is this?: Home/Residence |
| Historical Work: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Ballpark costs for foundation for mobile home 15'X 56' or 28'X 56' |
|
|
|
| Project Name: Repair a Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 11/09/2011 |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Comment: crack in foundation floor, need it reparied. |
|
|
|
| Project Name: Repair a Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 10/30/2011 |
| Damage Repair Type: Foundation cracked or broken |
| Size of Area: More than 10 sq ft |
| Presence of Water: Don't Know |
| What kind of location is this?: Home/Residence |
| Covered by Insurance: No |
| Financing Requested: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: There is a crack on the outside back wall of my block home. The crack is buldging at one point and you can see inside the foundation. The pipe inside it is rusting. There are no noticible issues inside the house. There are no water lines running inside by this part but there is a rose bed outside with a sprinkler. |
|
|
|
| Project Name: Install a New Concrete Foundation |
| Project Location: Chandler, AZ |
| Date: 09/28/2011 |
| Structural drawings exist for project: No |
| Type of Foundation: Poured concrete basement |
| Purpose of Foundation: Foundation for addition or small structure |
| What kind of location is this?: Business |
| Historical Work: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: We are seeking to create a concrete pit in an existing commercial structure approximately 35' x 22'. the existing concrete will need to be demo'd, the hole dug 2-3 feet, footers added, slab and side walls added. a ramp or stairs added. |
|