|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Wilmington, DE |
| Date: 09/01/2011 |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Wilmington, DE |
| Date: 08/14/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: Water is coming through the foundation into the basement. I need to have a yard regraded so that the water is kept away from the house. It appears that the grade is slightly towards the house. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Wilmington, DE |
| Date: 07/17/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: need back yard graded after a drainage ditch was put in. also need some stone moved around for a shed foundation. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Wilmington, DE |
| Date: 06/01/2011 |
| Purpose of Excavation: Other |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Comment: inground pool filled in and yard grading |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Wilmington, DE |
| Date: 05/04/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: fill in a vinyl 20 x 40 inground pool, grade backyard for drainage |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Wilmington, DE |
| Date: 04/03/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: we had foundation repairs completed last year. we want to have the site craded, a stump and roots removed to allow for a patio |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Wilmington, DE |
| Date: 01/24/2011 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| Tank Type: Steel |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: install above ground propane tank for heatink. 100 gallon. |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Wilmington, DE |
| Date: 12/13/2010 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Need old outside tank removed and know someone with a good tank that recently converted. Will need that tank picked up and installed at my house. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Wilmington, DE |
| Date: 10/30/2010 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Tree Stumps |
| Trees/Structures to Remove: Trees |
| Topography: Flat |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Getting ready to build a home |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Wilmington, DE |
| Date: 10/20/2010 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| Tank Type: Steel |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: Old oil tank in basement leaking. Want a replacement tank. Don't care if it's steel, fiberglass, etc. Whatever is most inexpensive. |
|