| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 02/06/2012 |
| Comment: I have driveway needs excavated |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 11/10/2011 |
| Purpose of Excavation: Small outbuilding (shed) |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: Yes |
| Property Owner: Yes |
| Comment: Need to dig a 50ft trench for Electrical conduit to pad for Red Box installation. Need this done asap. |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Vancouver, WA |
| Date: 07/05/2011 |
| Reason for Clearing: Landscaping |
| Topography: Flat |
| What kind of location is this?: Home/Residence |
| Financing Requested: No |
| Desired Completion Date: Less than 2 months |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: removal of aprx 40 cuyds of dirt - I will bring in the topsoil myself.... |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 06/29/2011 |
| Comment: needs estimate for excavation for pool install |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 09/13/2010 |
| Purpose of Excavation: Other |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Comment: a larger outbuilding to be removed. well tank to be relocated |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 06/24/2010 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: Within 1 week |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: Yes |
| Property Owner: Yes |
| Comment: We will remove existing ATM and canopy, sub will provide demo of existing concrete drive up Island 10 ft long, 3' wide by 2 to 3' deep. <br />Priceing to include demo haul off concrete, dirt, and rebar/steel.Also provide cost for excavation of pit for new concrete Island. Include a yard of gravel for footing bed. This job is in the city of Freeland, WA Chase bank. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 05/19/2010 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: Excavation & grading of back yard (patio, lawn, sport court). Future work would include excavation & grading of front and side yards. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 04/14/2010 |
| Comment: I need a est on getting 18 stumps removed needed them pulled out of the gound. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds - For Business |
| Project Location: Vancouver, WA |
| Date: 03/09/2010 |
| What kind of location is this?: Business |
| Comment: I need an estimate for excavation for dig and backfill |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Vancouver, WA |
| Date: 01/23/2010 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Yes |
| Consumer Owns Home: Yes |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Comment: I have a deadline of Feb 3rd to apply for a Grading/Stockpiling permit with the City of Vancouver. I wish to have an old backfilled railroad tie wall removed and hauled away. It is approximately 40 feet long, and 4 feet high, with approximately 75 yards of backfill behind it, mostly sand and earth, with a small amount of drain rock. Then, I would like the slope gently graded back to it's original state and rolled to smooth and compact the slope to prevent erosion. Finally, it will need to be seeded with a tough, drought resistant grass seed. |
|