|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Richmond, VA |
| Date: 11/15/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: WE are thinking of putting in a small basketball court in our yard but the ground needs to be leveled first. Wondering what something like this will cost? |
|
|
|
| Project Name: Install or Replace a Water or Fuel Tank |
| Project Location: Richmond, VA |
| Date: 10/18/2011 |
| Purpose of tank: Petroleum fuel storage |
| Location of tank: Above ground |
| Tank Type: Steel |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: More than 2 weeks |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Have an above ground fuel oil tank that I believe is possibly leaking, want to know how much a new tank costs ?? |
|
|
|
| Project Name: Clear Land and Prepare Building Site |
| Project Location: Richmond, VA |
| Date: 09/02/2011 |
| Reason for Clearing: Prepare for building |
| Trees/Structures to Remove: Tree Stumps |
| Trees/Structures to Remove: Trees |
| Topography: Steep Slope |
| What kind of location is this?: Home/Residence |
| Financing Requested: Yes |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Richmond, VA |
| Date: 08/22/2011 |
| Kind of Tank: Below ground |
| Material Stored in Tank: Heating oil |
| How Long Since Tank Was Used: 1-3 years |
| Leakage Details: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
| Comment: Need to pump out tank and abandon |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Richmond, VA |
| Date: 06/17/2011 |
| Comment: I am looking to have a heating oil tank in my basement looking to have the oil removed also looking to have the tank removed |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Richmond, VA |
| Date: 05/20/2011 |
| Comment: I need a quote for removing a fuel tank for the home |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Richmond, VA |
| Date: 05/09/2011 |
| Kind of Tank: Below ground |
| Material Stored in Tank: Heating oil |
| How Long Since Tank Was Used: 6-10 years |
| Leakage Details: No |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Within 1 week |
| Request Stage: Ready to Hire |
| Property Owner: Yes |
| Comment: need to have old underground oil tank drained completely and filled so it will not collapse. It is close to house, brick wall, and other structures. |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Richmond, VA |
| Date: 04/25/2011 |
| Purpose of Excavation: Home foundation |
| Site surveyed for underground utility lines: Don't know |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Planning & Budgeting |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: Water goes right into the crawl space because of the slope of the ground around the house. |
|
|
|
| Project Name: Remove a Water or Fuel Tank |
| Project Location: Richmond, VA |
| Date: 04/09/2011 |
| What kind of location is this?: Home/Residence |
| Desired Completion Date: Timing is flexible |
| Request Stage: Planning & Budgeting |
| Property Owner: Yes |
|
|
|
| Project Name: Excavate or Grade the Slope of the Grounds |
| Project Location: Richmond, VA |
| Date: 03/23/2011 |
| Purpose of Excavation: Other |
| Site surveyed for underground utility lines: No |
| Desired Completion Date: 1 - 2 weeks |
| Request Stage: Ready to Hire |
| Request for Commercial Location: No |
| Property Owner: Yes |
| Comment: A lot of soil has shifted towards the back of my yard against a fence. I need some bobcat work to move some soil around, grade my lawn, and dig a small trench for a pebble walkway I am going to build. |
|